Laserfiche WebLink
Rid ItculNo._06 - Demobilizati—on <br />1.1 5colze of Work <br />Under this item, the Contractor shall provide all labor materials, equipment and <br />incidentals necessary to furnish maintenance bond, record drawings, and final close out <br />documents, site cleanup, removal of all temporary facilities and services, final inspection, <br />activation of all water, storm and sanitary sewer systems, and final report. <br />1.2 Niaterials and Metliod <br />1.2.1 All closeout documents, submittals, and deficiencies in the work shall be <br />corrected. <br />1.2.2 The Contractor shall dismantle and remove from the project site all temporary <br />facilities and services along with construction equipment, tools and similar elements. <br />1.2.3 The Owner and Contractor shall make a final closeout inspection, a list of noted <br />deficiencies shall be prepared and the Contractor shall correct all deficiencies. <br />1.2.4 The Contractor shall prepare a final report within thirty (30) calendar days <br />following the final closeout inspection for submission to the Owner. The report, <br />structured to enable the reader to cross-reference with ease, shall include All written <br />results, analysis, data, reports, and records and any other information deemed <br />necessary. The Contractor shall supply an original and five (5) copies to the Owner. <br />1.2.5 The Contractor closeout procedures shall begin when all waste materials are <br />removed. <br />1.2.6 The Owner shall make a preliminary inspection after the Contractor provides a <br />written notice indicating that all the specified conditions have been met and the work <br />is 100% complete. <br />1.3 Method of Measurement <br />The quantity of demobilization to be paid Under Bid Item 1Vo 06 - ]emobiliza inn shall <br />be a lump stun amount for all labor, materials, tools, equipment and incidentals necessary to <br />demobilize. <br />The lump sum price laid for demobilization shall include all labor, materials, tools, <br />equipment and incidentals necessary to furnish surety bond, submit all contract closeout <br />documentation, record drawings, and final report, removal of temporary facilities and services, <br />removal of equipment, tools, and incidentals. <br />00310-19 <br />DID ITEM 06 — DEMOBILIZATION <br />CUercmixhloMrr�s PruleclPPMISeS • RML11+1lS Serer Impre�remenq'l10}I6 dne <br />