My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-049
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 12:48:46 PM
Creation date
3/18/2024 12:48:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/05/2024
Control Number
2024-049
Agenda Item Number
8.K.
Entity Name
Florida Department of Environmental Protection (FDEP)
Subject
Amendment No.2 FDEP Grant Agreement No. 19IR2 Hurricane Irma
Recovery Project Sector 7 Beach and Dune Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br /> CERTIFICATION ON LAST PAGE <br /> RYAN L. BUTLER, CLERK <br /> c. All construction materials are manufactured in the United States-this means that all manufacturing processes for <br /> the construction material occurred in the United States. <br /> The Buy America preference only applies to articles,materials,and supplies that are consumed in,incorporated <br /> into,or affixed to an infrastructure project.As such,it does not apply to tools,equipment,and supplies,such as <br /> temporary scaffolding,brought to the construction site and removed at or before the completion of the <br /> infrastructure project.Nor does a Buy America preference apply to equipment and furnishings,such as movable <br /> chairs,desks,and portable computer equipment,that are used at or within the finished infrastructure project but <br /> are not an integral part of the structure or permanently affixed to the infrastructure project. <br /> 25. Investing in America <br /> Grantees of an award for construction projects in whole or in part by the Bipartisan Infrastructure Law or the <br /> Inflation Reduction Act,including the following provision: <br /> a. Signage Requirements <br /> a. Investing in America Emblem: The recipient will ensure that a sign is placed at construction <br /> sites supported in whole or in part by this award displaying the official Investing in America <br /> emblem and must identify the project as a"project funded by President Biden's Bipartisan <br /> Infrastructure Law"or"project funded by President Biden's Inflation Reduction Act"as <br /> applicable. The sign must be placed at construction sites in an easily visible location that can be <br /> directly linked to the work taking place and must be maintained in good condition throughout the <br /> construction period. <br /> The recipient will ensure compliance with the guidelines and design specifications provided by <br /> EPA for using the official Investing in America emblem available at: <br /> https://www.epa.gov/invest/investing-america-signage. <br /> b.Procuring Signs:Consistent with section 6002 of RCRA,42 U.S.C.6962,and 2 CFR 200.323, <br /> recipients are encouraged to use recycled or recovered materials when procuring signs. Signage <br /> costs are considered an allowable cost under this assistance agreement provided that the costs <br /> associated with signage are reasonable.Additionally,to increase public awareness of projects <br /> serving communities where English is not the predominant language,recipients are encouraged to <br /> translate the language on signs(excluding the official Investing in America emblem or EPA logo <br /> or seal)into the appropriate non-English language(s).The costs of such translation are allowable, <br /> provided the costs are reasonable. <br /> 26. Scrutinized Companies. <br /> a. Grantee certifies that it is not on the Scrutinized Companies that Boycott Israel List or engaged in a <br /> boycott of Israel. Pursuant to section 287.135,F.S.,the Department may immediately terminate this <br /> Agreement at its sole option if the Grantee is found to have submitted a false certification;or if the <br /> Grantee is placed on the Scrutinized Companies that Boycott Israel List or is engaged in the boycott <br /> of Israel during the term of the Agreement. <br /> b. If this Agreement is for more than one million dollars,the Grantee certifies that it is also not on the <br /> Scrutinized Companies with Activities in Sudan,Scrutinized Companies with Activities in the Iran <br /> Petroleum Energy Sector List,or engaged with business operations in Cuba or Syria as identified in <br /> section 287.135,F.S.Pursuant to section 287.135,F.S.,the Department may immediately terminate <br /> this Agreement at its sole option if the Grantee is found to have submitted a false certification;or if <br /> the Grantee is placed on the Scrutinized Companies with Activities in Sudan List, or Scrutinized <br /> Companies with Activities in the Iran Petroleum Energy Sector List, or engaged with business <br /> operations in Cuba or Syria during the term of the Agreement. <br /> c. As provided in subsection 287.135(8), F.S., if federal law ceases to authorize these contracting <br /> prohibitions,then they shall become inoperative. <br /> 27. Lobbying and Integrity. <br /> The Grantee agrees that no funds received by it under this Agreement will be expended for the purpose of lobbying <br /> the Legislature or a State agency pursuant to section 216.347,F.S.,except that pursuant to the requirements of section <br /> 287.058(6),F.S.,during the term of any executed agreement between Grantee and the State, Grantee may lobby the <br /> executive or legislative branch concerning the scope of services,performance,term,or compensation regarding that <br /> agreement.The Grantee shall comply with sections 11.062 and 216.347,F.S. <br /> 28. Record Keeping. <br /> The Grantee shall maintain books,records and documents directly pertinent to performance under this Agreement in <br /> accordance with United States generally accepted accounting principles(US GAAP)consistently applied. The <br /> Department,the State,or their authorized representatives shall have access to such records for audit purposes during <br /> Attachment 1-A <br /> 10 of 13 <br /> Rev.9/15/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.