Laserfiche WebLink
SECTION 00530, Rev. 1— EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED <br />PRICE <br />THIS AGREEMENT ("Agreement" or "Contract") dated the 20th day of February in the year 2024 <br />by and between Indian River County Solid Waste Disposal District, a <br />dependent special district of Indian River County, which is apolitical subdivision in the State of <br />Florida (hereinafter called OWNER) and Comanco Environmental Corporation of Palm City, <br />Florida. (Hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified or <br />indicated in the Contract Documents. The work is generally described as follows: <br />1. Clearing, grubbing, and/or stripping the construction area as directed by the <br />Engineer or Owner; <br />2. Use of appropriate dust control measures during earthwork operations; <br />3. Construction of access ramp for Cell 3 construction; <br />4. Furnish materials for general/structural fill that meets the Technical Specifications, <br />placement and compaction to the subgrade grades shown on the Construction <br />Drawings; <br />5. Cleaning of the Segment 3 final cover geomembrane or liner system geomembrane <br />for tie-in (extrusion welding or double -track fusion welding as appropriate) to the <br />Cell 3 — Segment 3 Expansion geomembrane liners; <br />6. Proofrolling of compacted fill or prepared subgrade surface prior to placement of <br />the liner subbase; <br />7. Construction of Cell 3 — Segment 3 Expansion double liner system, including <br />anchor trench and temporary intercell berm/rain flap; <br />8. Construction of leachate detection, leachate collection, and leachate transfer <br />systems for Cell 3 — Segment 3 Expansion; <br />9. Construction of LCS manhole and LDS pump station; <br />10. Construction of Liner penetration boxes. <br />00530-1, Rev. 1 <br />