11. Construction of erosion and sediment control structures (including silt check dams, straw <br />bale barriers in perimeter ditches, and silt fence) as necessary to facilitate construction and <br />minimize erosion during storm events; <br />12. Clearing, grubbing, excavation, backfilling, compaction, grading, and proof rolling <br />necessary to facilitate construction of previously mentioned components of Phase 2 of Cell <br />3 — Segment 3 Expansion. <br />ARTICLE 2 ENGINEER <br />The project has been designed by Geosyntec Consultants, Inc., hereinafter called ENGINEER, and <br />who is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br />and authority assigned to ENGINEER in the Contract Documents in connection with completion <br />of the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized in the job. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Submit and secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating <br />construction. <br />(b) From 30 calendar days to 90 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Substantially complete the Work described in these Contract <br />Documents. <br />2. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(b) From 90 calendar days to 120 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />00530-2, Rev. 1 <br />