My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-119
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 12:32:17 PM
Creation date
3/22/2024 12:32:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2000
Control Number
2000-119
Agenda Item Number
11.G.1.
Entity Name
Carter Associates, Inc.
Subject
Work Order No. 6 for Professional Civil Services Master Agreement
for Vero Lake Estates Stormwater Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION III - SCOPE OF SERVICES <br />A. The ENGINEER will perform all necessary engineering design for construction plans and <br />specifications as described in Section I. No additional permits are required. Detailed Plans, <br />Specifications and Estimated Bid Quantities shall be prepared so that the work itemized in <br />Section I (B) above can be properly bid by the County. The work to be performed by County <br />® forces (Section I A), above will be constructed using the typical cross sections, as noted on the <br />permit plans. <br />• B. After issuance of a work order and written authorization to proceed, the ENGINEER shall <br />consult with the COUNTY to confirm the COUNTY'S requirements and objective for the <br />project, and review all available data. <br />C. The ENGINEER will strive to complete his work on the PROJECT within the time allowed by <br />maintaining an adequate staff of registered engineers, biologists, draftsmen, and other <br />employees on the work at all times. <br />D. The ENGINEER shall report the status of this project to the Director of Public Works <br />Department upon request and hold all drawings, calculations and revised work open to the <br />inspection of the Director or his authorized agent at any time, upon reasonable request. <br />E. TASK 02 — PROJECT DEFINITION (Vero Lake Estates Stormwater Improvements Phase 1) <br />The ENGINEER will perform and provide topographic and land surveying information <br />required of all areas of work. Detail of existing structures such as mail boxes, above and below <br />ground utilities, driveways, trees, etc. shall be provided. The ENGINEER will coordinate with <br />the COUNTY to assure access to the property after the limits of the project have been <br />established. <br />The ENGINEER will have the following required meetings with the County staff. <br />Program meeting to outline survey work and scope as defined. <br />30% drawings <br />60% drawings and specifications <br />90% construction plans and specifications <br />County will supply their STANDARD BID documents. <br />The Engineer will review the project with SJRWMD staff for their comments and <br />approval. <br />A. Prepare Base Sheet <br />• Perforin and assemble survey data for use in construction plans. <br />B. Engineering final design and specifications <br />• Prepare plans and specifications for structures, piping, and excavation. <br />Specifications shall include summary of estimated quantities. <br />C. One (1) additional review meeting of design and specifications with County staff. <br />D. Reimbursables - mileage, postage, printing, telephone <br />SECTION IV - TIME FOR COMPLETION <br />A. All survey and design work will occur between October 1, 1999 and July 1, 2000 in accordance <br />with the FDEP Grant requirements. CAI will deliver the plans, specifications and summary of <br />quantities to the County for bidding purposes on or before May 1, 2000 so that bids may be <br />received and actual construction started on July 1, 2000. <br />SECTION V - COMPENSATION <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept fee for services rendered according <br />to the Scope of Services, Task 02, identified in Section III of this work order with a maximum charge under this <br />work order of $ 6,955.00. This fee is itemized as follows: <br />1:1CYN\ENGPROJ\IRCSIonnwlrMgnttlmprovc\VeroUEslmesllRC-WRKORDERNO6-TASK2.doc Page 2of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.