My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/06/2024
CBCC
>
Meetings
>
2020's
>
2024
>
02/06/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 10:06:29 AM
Creation date
3/27/2024 9:44:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/06/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Proposal <br />To: Indian River County <br />Attn: Harrison Youngblood <br />Project: IRC Lift Station #5 Griffon <br />Description: Remaining contract work to complete original PO. <br />Date: January 30, 2024 <br />Revised: <br />Proposal No: Final <br />HG Project No: 19-0099-12 <br />e <br />Item # <br />Description <br />Qty <br />Unit <br />Unit Price <br />Extended Price <br />Additional <br />Time -Day <br />3 <br />Mobilization/Demobilization <br />0.5000 <br />LS <br />$1,701.90 <br />$850.95 <br />34 <br />6" Bypass Pumping Operation- Primary Pump - 11/1/23 thru 1/31/24 <br />92.0000 <br />DAY <br />$794.22 <br />$73,068.24 <br />34 <br />6" Bypass Pumping Operation- Standby Pump - 11/1/23 thru 1/31/24 <br />92.0000 <br />DAY <br />$794.22 <br />$73,068.24 <br />99 <br />Duplex Remote Terminal Unit (Install Only <br />0.5000 <br />EA <br />$6,807.60 <br />$3,403.80 <br />104 <br />Duplex Motor Control Panel (Install Only) <br />0.2500 <br />EA <br />$70,345.00 <br />$17,586.25 <br />193 <br />Cast In Place Concrete <br />150.0000 <br />CF <br />$56.73 <br />$8,509.50 <br />194 <br />Reinforcing Steel for Cast In Place Concrete <br />234.0000 <br />LB <br />$11.35 <br />$2,655.90 <br />235 <br />Three Man Pipe Excavation and Repair Crew (Generator And Top <br />Slab Demo, Generator Replacement) <br />8.0000 <br />HR <br />$363.07 <br />$2,904.56 <br />Al -17 <br />Al -17 - Install Meter Can & Disconnect <br />0.5000 <br />EA <br />$7,261.44 <br />$3,630.72 <br />Instal GC Furnished ATS <br />0.5000 <br />1 EA <br />$8,600.00 <br />$4,300.00 <br />Qualifications: <br />Subtotal: <br />$189,978.16 <br />Removal of unknown obstructions not included. <br />Removal of unknown conflicts not included. <br />Permits and permit fees not included. <br />Tax <br />Total: <br />$189,978.16 <br />Delays due to inspections not included. <br />Any delays due to Covid-19 from any party in the supply, production or construction chain will require time in addition to that shown. <br />Electronic locating services of any kind are not included. <br />Asphalt Restoration will be based on the number of locations required. <br />Hinterland Group Inc. Corporate Office <br />Page 1 of 1 2051 W Blue Heron Blvd. Riviera Beach, FL 33404 - Ph 561-640-3503 - Fax 561-640-3504 14 laage 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.