My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-143
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 3:18:31 PM
Creation date
4/2/2024 3:18:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
05/09/2000
Control Number
2000-143
Entity Name
North County Water Treatment Plan - Permitting Services
Subject
Engineering Services Work Authorization 12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />40 <br />L> <br />A. Salary Cost Basis with Upper Limit <br />For the Basic Services performed on a salary cost basis with an upper limit, IRC <br />agrees to pay CDM as follows: <br />For engineering services performed by CDM, the payment will be equal to the <br />salary cost of such services for each employee times 2.3 for overhead and profit <br />plus actual out-of-pocket expense costs. Salary cost is equal to 1.393 times direct <br />salary costs and is defined as the cost of salaries (including sick leave, vacation, and <br />holiday pay applicable thereto) for time directly chargeable to the project; plus <br />unemployment, excise, and payroll taxes; and contributions for social security, <br />employment compensation insurance, retirement benefits, and medical and other <br />group insurance benefits. <br />Actual out-of-pocket expense costs are all costs other than salary costs that are <br />incurred during the progress of the work. The actual out-of-pocket expense costs <br />include: air fare, automobile rental if required, mileage charges, parking tolls, taxi, <br />meals, lodging, telephone, printing and reproduction costs, and other <br />miscellaneous costs incurred specifically for this project. The maximum cost for <br />blueprint sheets is $1.10. The maximum cost for mylar sheet is $11.00 and a sepia <br />sheet is $5.00. The charges for in-house computer program and word processor <br />usage will be at CDM's regular rates. For outside computer services, charges will <br />be made at invoiced cost to CDM. <br />For the basic services performed on a salary cost basis with an upper limit, IRC agrees to <br />provide a written request before work is started by CDM. <br />SUBMITTED BY: <br />CAMP DRESSER & McKEE INC. <br />(Consultant) /��n <br />By � U1.slLa.rtu 1 <br />E. Lawrence Adams, Jr., P.E. D. .E. <br />Vice President <br />Date��2lo�0 <br />&3081.do <br />APPROVED BY: <br />INDIAN RIVER COUNTY. <br />BOARD OF COUNTY COMMISSIONERS <br />Fran B. Adams <br />t< <br />Chairman <br />DateMay9. 2000, 2000 <br />IrMtn film t a Ap�ored Oatr <br />Admin. <br />5 <br />Lognl <br />�-Sj" <br />BUdctE <br />l.— <br />Rick Mnr <br />
The URL can be used to link to this page
Your browser does not support the video tag.