My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-061
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 10:08:20 AM
Creation date
4/4/2024 10:07:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/19/2024
Control Number
2024-061
Agenda Item Number
8.D.
Entity Name
Ritacco & Chan Architecture, LLC
Subject
Agreement for Jones’ Pier Conservation Area Design &
Fabrication of Interpretive Center Exhibits; RFP 2024014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R + C <br />ARCHITECTURE <br />PLAN NTNG <br />COMMUN I T Y <br />R + C Design and Construction Fee Proposal: 4 months design, 3 months construction <br />R + C's services is defined under the Description and Scope of work section on page 1. <br />Our work is a lump sum, fixed fee: $72,800. This is based on Design of $54,600 and Construction <br />administration of $18,200. This professional service includes: conceptual design, design <br />development and construction administration. During conceptual design and design <br />development, R + C will meet and work together with Client to create a comprehensive, unique <br />design for the Jones Pier Exhibit. R + C will coordinate with Donadio to ensure that the interior <br />design works with the overall renovation of the historic house. During construction <br />administration, we will coordinate the installation on site with the vendors. <br />The service will be distributed over a 7 -month schedule with approximately 15 meetings with the <br />client and 9 meetings during construction. If additional meetings are requested by client, R + C <br />will meet at no additional cost beyond the lump sum. <br />Material and Fabrication Budget <br />The preliminary budget is an estimate based on preliminary quotes from vendors and suppliers. <br />The estimate construction budget is set at $156,000. The budget may change based on <br />selections and deletions by Client. We are reviewing options of cabinet door pricings with <br />cabinet maker. See budget on page 3. <br />Payment Schedule: 4 months design, 3 months construction <br />3/05/2024 <br />Tentative Board Approval <br />3/12/2024 <br />executed Agreements back from BCC <br />3/26/2024 <br />20% of design fee <br />4/26/2024 <br />20% of design fee and 50% deposit for cabinetry <br />5/26/2024 <br />20% of design fee <br />6/26/2024 <br />20% of design fee <br />7/26/2024 <br />20% of design fee <br />8/26/2024 <br />Final payment of remaining retainage and any other fees <br />Office: 2109 Hawk River Drive 5W, Vero Beach, Florida, 32962 1 Phone: 772 588 4999 1www.rcarch.org I Email: info@rcarch.org 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.