My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-181
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 9:52:06 AM
Creation date
4/22/2024 9:51:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/10/2000
Control Number
2000-181
Agenda Item Number
14.B.1.
Entity Name
Glace & Radcliffe, Inc.
Subject
Amendment 1 for Site Plan Finalization for the Solid Waste Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of <br />40 <br />40 <br />40 <br />This Phase I audit is intended as a general overview of the site based upon site visits, <br />owner's testimony and readily available public documents. No geotechnical work or <br />other fieldfanalytical services is proposed. If such services are required, they will be <br />provided in a subsequent Phase II environmental audit, which is unpriced at this time. <br />The Engineer will prepare three (3) copies of a draft Phase I report for review by the <br />County and the Appraiser retained as part of this amendment. After receipt of comments, <br />the Engineer will provide five (5) final copies of the report; three (3) to the County and <br />two (2) to the subconsultant appraiser. <br />B. Appraisal Services <br />The Engineer will provide the services of two certified appraisers. Two appraisers are <br />provided to assure values are consistent. The appraisers will opine as to (lie value of the <br />outparcel. The Appraisers will provide title search and methodology for determination of <br />value. <br />The Appraisers will provide a draft appraisal report For designated County staff review. <br />The final appraisal reports will be provided to the County after authorization. The <br />specific appraisal services are outlined in the attached proposals. <br />C. Negotiations with Owner <br />It is anticipated that up to three (3) meetings will be held with the owner of the outparcel <br />to discuss acquisition. The Engineer along with the Appraisers will be prepared to discuss <br />their respective reports. <br />D. Schedule <br />The following is the anticipated schedule of this project. The schedule may be modified <br />pursuant to the agreement of the Engineer and County. Also this schedule is independent <br />of the Master Plan Schedule. <br />Task <br />site Visit <br />Title Information <br />Draft Phase I Audit <br />Final Phase I Audit <br />Draft Appraisal <br />Meeting with Owner <br />E. Project Assumptions <br />From Authorization to Proceed <br />Two (2) Weeks <br />Four (4) Weeks <br />Seven (7) Weeks <br />Two (2) Weeks from receipt of comments <br />Eight (8) Weeks <br />As Determined by the County <br />The amendment does not include any expert witness or condemnation assistance. Further, <br />a phase TI study will require an additional authorization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.