Laserfiche WebLink
is <br />C_3 <br />• <br />w <br />//-d <br />Work Authorization No. 4 oo V+f <br />P <br />Attachment A <br />SCOPE OF SERVICES AND SCHEDULE <br />INDIAN RIVER COUNTY UTILITIES DEPARTMEN"f <br />EVALUATION OF SLUDGE HANDLING FACILITY <br />Project Understanding; <br />Indian River County Utilities (IRCU) currently owns and operates a sludge receiving and <br />dewatering facility located at the Gifford water reclamation plant. This facility receives <br />sludge from the County's wastewater treatment facilities, private wastewater plant <br />sludges, septage, and grease. Basically the system includes storage, mixing, degritting, <br />and belt presses for dewatering. Dewatered sludge is hauled to the County's landfill for <br />final disposal. <br />As the sludge handling, facility has been operational for several years, certain aspects of <br />the system as originally conceived, require modification. Also, the County has made a <br />number of changes to reduce operational costs of the facility but has identified additional <br />cost savings that may require modification to the system. Also, the Comity wishes to <br />consider impacts to the facility if additional sludge is brought into the system for <br />processing. Therefore, the County has requested Glace & Radcliffe, Inc. ("the Engineer") <br />prepare an evaluation of the facility modifications and potential expansion requirements. <br />Scope of Services <br />The Scope of Services for this project consists of an evaluation of IRCU's sludge <br />management facility. The following is a summary of the specific scope requirements: <br />Task 100 :Site Visit and Staff Brainstorming Session <br />A. Site Visit <br />The Engineer will visit the site to observe operations and obtain information from <br />operational personnel concerning facility perfornrrnce.'fhis visit will be for one (1) day. <br />B. Brainstorming Session <br />The Engineer will meet with County staff to discuss specific issues of the facility along <br />with developing a list of specific recommended modifications and identity priorities for <br />modification. It is anticipated that this meeting will take approximately 4 hours. <br />