Laserfiche WebLink
as <br />Ob <br />• <br />• <br />From this meeting, the Engineer will prepare a summary of the discussion and specific <br />recommendations. This summary will be provided to the County for approval. After <br />approval, the Engineer will incorporate the recommendations into the evaluation report. <br />Task 200 Evaluation Report <br />A. Sludge Generation Projections <br />The Engineer will take prior sludge generation quantities and develop a projection of <br />sludge to be delivered to the County's sludge handling facility. As a modification to the <br />projection, the Engineer will also include potential new entities delivering sludge to the <br />system. The Engineer will also take into account modifications to the Gifford water <br />reclamation facility as it relates to sludge production. <br />B. Analysis <br />From the on site visit results, discussions with staff, and sludge projections, the Engineer <br />will prepare an analysis of the facility which will include the following: <br />■ Modification of the ramps and potential dump station for larger vehicles <br />■ Improvements to grease handling facilities <br />Upgrade onsite lift station to reduce back ups <br />0 Modifications to odor control system <br />■ Improvements to sludge mixing, pu€nping, and nietcring <br />Increased capacity (sludge holding and belt filters) for future sludge flows <br />■ Electrical control and standby power improvements. <br />From the above evaluation, the Engineer will take c\isting as built plans of the facility <br />and provide conceptual design sketches of the proposed mechanical system <br />improvements. Further the Engineer will establish costs for improvements listed above. <br />The Engineer will then meet with County staff to discuss the recommendations and <br />evaluations to establish priorities of the modifications. <br />Task 300 Submittal of Report <br />After completion of the evaluation in Task 200, the Engineer will summarize the <br />recommendations in an evaluation report. Five (5) copies of the report will be presented <br />to the County for review. The Engineer will meet with Iridian River County <br />representatives to review their comments on the report. After receipt of County <br />comments, the Engineer will present five (5) copies of the final report to the County. <br />Schedule <br />Unon authorization of the County, the project schedule will be as follows unless modified <br />by the Engineer and the County: <br />