My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-182
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 9:55:20 AM
Creation date
4/22/2024 9:55:06 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/13/2000
Control Number
2000-182
Agenda Item Number
11.H.5.
Entity Name
IRC Utilites Department
Subject
Work Authorization No. 4 for Residuals Facility Evaluation & System Improvements
Sludge Handling
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as <br />Ob <br />• <br />• <br />From this meeting, the Engineer will prepare a summary of the discussion and specific <br />recommendations. This summary will be provided to the County for approval. After <br />approval, the Engineer will incorporate the recommendations into the evaluation report. <br />Task 200 Evaluation Report <br />A. Sludge Generation Projections <br />The Engineer will take prior sludge generation quantities and develop a projection of <br />sludge to be delivered to the County's sludge handling facility. As a modification to the <br />projection, the Engineer will also include potential new entities delivering sludge to the <br />system. The Engineer will also take into account modifications to the Gifford water <br />reclamation facility as it relates to sludge production. <br />B. Analysis <br />From the on site visit results, discussions with staff, and sludge projections, the Engineer <br />will prepare an analysis of the facility which will include the following: <br />■ Modification of the ramps and potential dump station for larger vehicles <br />■ Improvements to grease handling facilities <br />Upgrade onsite lift station to reduce back ups <br />0 Modifications to odor control system <br />■ Improvements to sludge mixing, pu€nping, and nietcring <br />Increased capacity (sludge holding and belt filters) for future sludge flows <br />■ Electrical control and standby power improvements. <br />From the above evaluation, the Engineer will take c\isting as built plans of the facility <br />and provide conceptual design sketches of the proposed mechanical system <br />improvements. Further the Engineer will establish costs for improvements listed above. <br />The Engineer will then meet with County staff to discuss the recommendations and <br />evaluations to establish priorities of the modifications. <br />Task 300 Submittal of Report <br />After completion of the evaluation in Task 200, the Engineer will summarize the <br />recommendations in an evaluation report. Five (5) copies of the report will be presented <br />to the County for review. The Engineer will meet with Iridian River County <br />representatives to review their comments on the report. After receipt of County <br />comments, the Engineer will present five (5) copies of the final report to the County. <br />Schedule <br />Unon authorization of the County, the project schedule will be as follows unless modified <br />by the Engineer and the County: <br />
The URL can be used to link to this page
Your browser does not support the video tag.