Laserfiche WebLink
of <br />as <br />• <br />4D <br />Project Task <br />Site Visit <br />Brainstorming Session <br />Summary of Facility Issues <br />Evaluation Summary <br />Draft Report to County <br />Final Report to County <br />Project Assumptions <br />From ,Authorization to Proceed <br />Two (2) weeks <br />Three (3) weeks <br />Four (4) weeks <br />Bight (8) weeks <br />Ten (10) weeks <br />Two (2) weeks after receipt of <br />County comments <br />No surveying or geotechnical work will be required. The Engineer will assume facilities <br />on as built plans are correct. For any future final design services, survey and geotechnical <br />work will be required. <br />No presentations to the Board of County Commissioners or Utilties Advisory Board is <br />assumed for this project. <br />FEE <br />The fee For this project is as described in Attachment B as a [LIMP stun amount of <br />$24,853. Partial payments will be submitted monthly based upon a percent complete for <br />each task. Steve Bailey with Bailey and Associates has been retained to accomplish a <br />review of the electrical system along with making estimating the cost of any control <br />system modifications. <br />Approvals <br />The project proposal is accepted by the County and the Engineer as witnessed by the <br />following signatures: <br />Glace & Radcliffe, Inc. Indian River County <br />Dai L. Fran B. Adams, Chairman <br />Pres ent BCC Approved 06-13-2006 <br />Attest PCV est <br />,j iura cn aDPrvnd 441c ?- <br />Aq+»In. 1,rj [1 FJ <br />E3t�drywtt,J (. <br />US!!i1lCL _VO " <br />FiiGk Mgr. <br />