My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-201
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2024 11:55:04 AM
Creation date
4/22/2024 11:54:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/20/2000
Control Number
2000-201
Agenda Item Number
11.H.5.
Entity Name
Camp Desser & McKee Inc.
Subject
Engineering Services Work Authorization 13 for South County Water Treatment
Plant Well System Rehabilitation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�--A <br />Task 16.0 Report <br />A report will be generated that summarizes the rehabilitation activities performed on each <br />well. Included in the report will be an evaluation of pre and post rehabilitation results and <br />of the regional water level trends. <br />Surface Facilities <br />Task 1.0 Electrical Evaluation <br />An evaluation of the electrical components of the controls at each wellhead is <br />recommended. The evaluation should consist of checking each component to make sure <br />it is operating properly. Included in this evaluation will be a logic circuit test, solenoid <br />function test, and motor inspection. Any minor deficiencies identificd shall be repaired. <br />Major deficiencies shall be referred to the County for further action. <br />Task 2.0 Mechanical Evaluation <br />An evaluation of the mechanical features shall be performed. A manufacturer's <br />representative shall evaluate the check valves and air release valves to determine if the <br />valves are operating properly. The Engineer will assist in coordinating the manufacturer's <br />representative visit. A visual inspection of the wellheads should also be undertaken to look <br />for structural integrity, pipe leakage, and cracks in the concrete supports. <br />Task 2.1 Replacement/ Relocation of Wel] Appurtenances <br />The WTP staff have identified a valve on well no. 1 that requires replacement. Staff also <br />suspects that certain flow meters are providing some questionable readings indicating that <br />they may need to be replaced. Additionally, the flow meters for wells 1,2, and 3 are buried <br />below ground, and require construction of a meter vault for proper operation and <br />maintenance. The Contractor shall perform replacement and relocation services on a per <br />hour basis. <br />TIMING; <br />The parties agree that time is of the essence regarding this Contract, and the parties <br />further agree that Task 1.0 will begin within twenty days of County Commission execution, <br />and that Tasks 2-16, take place within 45 -days on a per -well basis, and that no more than <br />two wells at a time be taken out of service for maintenance, except by written permission <br />of the County's representative. The entire work plan in Attachment C, must be completed <br />0 by December 1, 2000. <br />10137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.