My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-222
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2024 9:45:46 AM
Creation date
4/25/2024 9:37:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2000
Control Number
2000-222
Agenda Item Number
11.C.2.
Entity Name
Don Howell Gilmore Associates, Inc.
Subject
Agreement for Main Library Addition & Rremodeling
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA <br />C1 <br />2.8.6.2 The Architect's inspection shall at the option of the Owner be conducted with the turner's Designated Representative <br />to check conformance of the Work with the requirements of the Contract Documents and to verify the accuracy and <br />91- completeness of the list submitted by the Contractor of Work to be completed or corrected. <br />2.6,6.3 When the Work is found to be substantially complete, the Architect shall inform the Owner about the balance of the <br />Contract Sunt remaining to be paid the Contractor, including any amounts needed to pay for fatal complctialt or correction of <br />Ilie Work - <br />2,6.6.4 The Architect shall receive from the Contractor and fonvard to the t7+,vncr: (1) consent of surety or sureties, if any. to <br />reduction in or partial release of retainage or lite Making of final pnyrnenl and (2) affidavits, receipts, releases and waivers of <br />liens or bonds indemnifying the Owner against liens - <br />ARTICLE 2,7 FACILITY OPERATION SERVICES <br />2.7.1 The -Arehitaet-slu}il-tnneel -with -fl}e -OWnor -Or -lite-t3wneT4 -Desigrtnit d -Representative-tromplly -alter 5ubs4nntiai <br />GO tin plekelrl0 a :hexa}ee&fer4aei' rntiera- K_ : _ <br />2.7.2 Upon -request -of4he-Owner; -and -pfief-to 4he-eXpiFntkM -Of -one-vetxr4'rvm -the -dote-of -Sttbstr}nkat-Ceneplaton_'_l}e- <br />�krtshiteet-sholl�ettduot�-}n®eting-vitt}�l}e-9wtter�tnd#lteews-Besigrurted-Replaaserttativa-Ea-review-the-fesilitg�eretie}};� <br />And-piL'rfArnl#IriE+L B}}d-Ee�linlf&dpprglir69tC-rCCC-0It}nYef}df4tr�i5-lU-tlSi��M1M1l3Ct': <br />ARTICLE 2.8 SCHEDULE OF SERVICES <br />2.8A Design and Contract Administration Services beyond the following limits shall be provided by the Architect as a <br />Change in Services in accordance with Paragraph 1.3.3: <br />1 up to L%W (2 ) reviews of each Shop Drawing. Product Data item, sample and similar srrhmittal of the <br />Contractor. <br />.2 up to two trcr month ( ) visits to lite site by the Architect over the duration of lite Project during construction. <br />.3 up to tw'o (? ) inspections for any portion of lite Work to determine whether such portion of the Work is <br />substantially complete in accordance with the requirements of the Contract Documents. <br />.4 up to two ( Z ) inspections for any portion of lite Work to determine Final completion. <br />2.8.2 The following Design and Contract Administration Services shall be provided by the Architect as a Change in Services <br />in accordance with Paragraph 1.3.3; <br />- ,1 review of a Contractor's submittal out of sequence from the submittal schedule agreed to by the Architect; <br />.2 responses to the Contractor's requests for information where such information is ava'slablc to the Contractor Front a <br />careful study and comparison of the Contract Documents, field conditions. other Chvner-provided information, <br />Contractor -prepared coordination drawings. or prior Project correspondcncc or documentation,. <br />3 Change orders and Construction Change Directives requiring evaluation of proposals. including the preparation <br />or revision of4astfuments-ef-SeMea drawiu s cifl__pc _,catiotts or other ductImcnIs, and not resultin from the <br />Architect's negl'igertce; <br />.4 providing consultation concerning replacement of Work resulting from fire or other cause not theiuult of the <br />Architect during construction; <br />.6 evaluation of an extensive number of claims submitted by the Owner's consultants, the Contractor or others in <br />AIA lXXIIA'IRNI' 11141.s'rANDARD FORM SI:ItN1CFS - 1997 iii)rnoN - MA- CUl't'lguirr 3997 'I'n1? ANWHICAK l\11111 1: OF ARCMITICTS, (735 <br />Nt'.W YORK AVd:NIX. N.W.. W+'CSnINOWN, D.0 2I1dH16.52M WARNINOi t lntiw wdgi�d+,xxpYm� siulaioc l r s, ta�r}n rpt tats mud trill suhjctt Ute weolattx Icy l <br />pr lwiva. This &%UA 1 w&%al uxrmic lly ptud"md Aidr paimimim of Ute AIA and t_an Iv npio duvW tt4houi tiulAj n witil ilia LiW ul -VITaL m nvn Ao d WI ntt <br />l l ctronicForntal B141-1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.