• <br />4W <br />F,gch subcontract agreement shall preserve and protect the rights of the Owner ;and Architect under the Contract Documents <br />with respect to the Work to be performed by the Subconlrlclor so that subcontracting thereof will not prciudice such rights. and <br />shall allow to the Subcontractor, unless spccifacttly provided otherwise in the subcontract agreement. the benefit of all rights, <br />remedies and redress against the Contractor that the Contractor, by lire Contract Documents, has against the Clivner. Where <br />appropriate, the Contractor shall require etch Subcontractor to enter into similar agreements with Sub -subcontractors. The <br />Contractor shall make available to each proposed Subconlmclor. prior to the execution of the subcontract agreement, copies of <br />the Contract DocunenLs to which the Subcontractor will be bound, and. upon written request of the Subcontractor, identify to <br />the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract <br />Documents. Subcontractors shall be similarly mire 1v will similarly make copies of applicable portions of such documents <br />available to their respective proposed Sub-subconlraclors. <br />5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS <br />5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the O%vner provided that: <br />.1 assignment is effective only after termination of the Contract br' the Ohvncr for cause pursllam to Paragraph 14.2 <br />and only for those subcontract agreements which the Owner accepts by notifying the Subcontraclor and Contractor <br />in writing-, and <br />.2 assignment is subject to the prior rights of the surely, if any. obligated under a frond or bonds relating to the <br />Contract. <br />6.4.2 Upon such assignment, if the Work has leen suspended for more Ilion 30 day's, the Subcontractor's compensation shall <br />be equitably adjusted for increases in cost if any, resulting from the suspension. <br />ARTICLE 6CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS <br />6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS <br />GAA The Chvncr reserves the right to perform construction or operations related to the Project with the Chvncr's own forces. <br />and to award separate contracts in connection with other portions of the Project or other construction or operations on the site <br />under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and <br />waiver of subrogation. -delay-or-ndditional-cost 4s-iavolved-bmuse-of-such-aOion -by-4he-Owner; <br />luta C ntfaetnr sha3t irrnke�udh ClaitPal`1191`00113- <br />6.1,2 When separate contracts are awarded for different portions of the project or other construction or operations on the <br />site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate <br />Owner-Conlraclor Agreement. <br />6.1.3 The Owner shall provide for coordination of the activities of Clic Chvner's own forces and of each separate Contractor <br />with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other separat, <br />contractors and the Owner in reviewing their construction schedules andperformance rcnlurenients when dirccled to do so. The <br />Contractor shall make any revisions to the construction schedule deemed necessary niter a joint review and mutual agreement. <br />The construction schedules shall then constitute the schedules to be used by the Conlraelor, separate contractors and the Other <br />until subsequently revised. <br />6.1.4 Unless otherwise provided in the Contract Documents, when Otte Owner performs construction or operations related to <br />the Project with the Owner's own forces, the Owner shall be deemed to be subject to the same obligations and to have the same <br />rights which apply to the Contractor under the Conditions of the Contract, including, without excluding others, ('[lose staled in <br />Article 3, this Article 6 and Articles 10, 11 and 12. <br />6.2 MUTUAL RESPONSIBILITY <br />6.2.1 The Contractor shall afford the Owner and separate contractors reasonable oppo.lunity for introduction and storage of <br />their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor's <br />construction and operations with theirs as required by the Contract Documents. <br />AIA Dr3CtWENT A2nt-1HNFFIAI, CONDITIONS t1FITJECSNIVA.CT FOR CON:i"rRt1CT10N-1"]Y7F.I)TI'ION -AIA -C'tIYYnnlI IT 1917-1111'.."WRIC'AN <br />1MS°"rrrfIV OF ARC1I111'.M, 1731 NEV YORK AVI'..NIT' N."'.. WMIRN(ITON, 1),C. 11111tH -5291 11'ARNlN1i. 1'n11-1 Idut- x'Ving violet_ (I:s. <br />v+ y for lucre lard will suhim the violator to } Cpl p1 ,m din. This J, vinm% vias cIoltwiiwllw Vm0m vl %silh 1nYn+—i— ,I air ,11,1 md u i Iv a.pu d i vd m ithow <br />violatu. amu l lllo dale or�gi ination ai m>led lwl,m. <br />Electronic Formal A201-1997 <br />User Document: VERO -- 711112(KKl. AIA License: Number 10461H), which espito on 1l6121x)1 — Page 024 <br />