40 <br />40 <br />` 5.2.2 If pari of the Contractor's Work depends for proper execution or results upon construction or operations by the [honer <br />or a separate contractor, the Contractor sha1L prior to proceeding with that portion of the Work, promptly report to the <br />Architect apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution <br />and results, r'aiharc or the Contractor so to report shall constitute an acknowledgment that the Owner's or separate contractor's <br />completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then <br />reasonably discoverable. <br />5.2.3 The [butter shall be reimbursed by the Contractor for costs incurred by the Owner which are payable to a separate <br />contractor because of delays, improperly timed activities or defective constntction of the Contractor. The Owner shall be <br />responsible to the Contractor for costs incurred by the Contractor because of delays, improperly timed activities, damage to the <br />Work or defective construction of a separate contractor. <br />6.2.4 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially <br />completed construction or to property of the Owner or separate contractors as provided in Subparagraph 10.2.5. <br />6+.2.5 The Owner and tach separate contractor shall have the same responsibilities for cutting and patching as are described <br />for the Contractor in 'Subparagraph 3.14. <br />6.3 OWNER'S RIGHT TO CLEAN UP <br />5.3.1 If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their <br />respective contracts for maintaining the promises and surrounding area frac from waste materials and rubbish, the Owner may <br />clean up and reasonably the -Architect -will allocate the cost among talose responsible_ <br />ARTICLE 7 CHANGES IN THE. WORK <br />7.1 GENERAL <br />7.1.1 Changes in the Work may be accomplished after execution of ilia Contract, and without invalidating tote Contract, by <br />Change Order, Construction Change Directive or order for a minor change in lite Work, subject to the limitations stated in this <br />Article 7 and elsewhere in the Contract Documents. <br />7.1.2 A Change Order shrill be based upon agreement among the Owner, Contractor and Architect; a Construction Change <br />Directive requires agreement by the Owner and Architect and may or may not be agreed to by the Contractor; an order for a <br />minor change in lite Work may, be4sstted43y4 te-Arehiteet-alone, subject to.the Owner's Re resenFative rior ►v°ritten a royal <br />be issued by the Architect. <br />7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Dacuments, and the Contractor <br />shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive or order for a minor <br />change in the Work. <br />7.2 CHANGE ORDERS <br />7.2.1 A Change Order is a written insinnnient prepared by the Architect and signed by the Owner, Contractor and Architect, <br />stating their agreement upon ani of the following: <br />.1 change in the Work, <br />.2 the amount of the adjustment, if any, in the Contract Stan; and <br />.3 the extent of the adjustment, irony, in the Contract Time. <br />7.2.2 Methods used in determining adjustments to the Contract Slim may include those listed in Subparagraph 7.3.3. <br />7.3 CONSTRUCTION CHANGE DIRECTIVES <br />1AU[1CifhlFtN3A7u1-c,l?NiiR�'ft.('[i�i!]IIItlNtiill�'I'Ill±tYllfRA1C1'llsl<([Yti5'I°lift"IitrN 1997F!L1Y'1'Itl;v rllA-['[il'YRS[iltflJY7 'I`n14:111Ffi1('.RN <br />1N.41Trtr1F. OF ARC1111T.M. 1735 NFN YORK AVKNt.Ri N.w., WASHINIGION, IPC,. 21HHI65272. W,%FNiN[I. l+nli=Lwl 1>I1�Mu�c�+ya+� •�iulxt�x t+.ti <br />uvyri& Iowa FM will x bic�i sire viulala to I,Tpl pr dim. TbN arxumall wax cat%1pXiimlly iu,nln..ul with lraustaiutr or die AIA Wil 4ba tV ITI-11MA withmd <br />viowim until the dal" Ut'ovur.uix, w tiutnt Id— Electronic Formal A201-1997' <br />User Documenc 1+'C110 — 711112ltou, AIA License Number 1114600. which cx;pires on 116lZFHI I -- Pagc N25 <br />