lig <br />Article 3. CONTRACT TIME. <br />3.1 The work will be completed in accordance with the <br />following time frame. <br />(a) Within 70 calendar days from effective date of <br />Notice to Proceed, CCINTRACTOR shalt complete the <br />following tasks: <br />1. Obtain all necessary hermits. <br />2. Receive approved shop drawings for all <br />materials and equipment to be utilized in the <br />job. <br />1. Perform all photographic recording and <br />documentation of condi tions prior to <br />construction. <br />4. pacate all existing utilities in the area of <br />work. <br />S. Mobilize all labor, equipment. " materials. <br />6. Deliver and store all equipment and materials <br />to the jab site. <br />7. Notify all utilities and other affected <br />parties prior to initiating construction. <br />(b) From 71 calendar days to 100 calendar days from the <br />effective date of Notice to Proceed. the CONTRACTOR <br />shall complete the following tasks <br />1. install all pipe and appurtenant items. <br />2. Perform all testing. <br />3, Restore all disturbed areas to their <br />preconstruction condition. <br />4. Correct all deficiencies noted by ENGINEER. <br />Crxrpletion of all tasks outlined above (i.e.. Subparagraphs a <br />and b) constitute Substantial Completion. <br />c) From 3V1 ,calendar days to 169 calendar days from <br />the effective date of Notice to Proceed, the <br />CONIRACTOR shall complete the following tasks: <br />1. Clean up project area.. <br />2. Remove all equipment and material from project <br />site. <br />3. Perform contract close-out procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, <br />b, and c) constitutes final completion. <br />FA -2 <br />