My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lig <br />Article 3. CONTRACT TIME. <br />3.1 The work will be completed in accordance with the <br />following time frame. <br />(a) Within 70 calendar days from effective date of <br />Notice to Proceed, CCINTRACTOR shalt complete the <br />following tasks: <br />1. Obtain all necessary hermits. <br />2. Receive approved shop drawings for all <br />materials and equipment to be utilized in the <br />job. <br />1. Perform all photographic recording and <br />documentation of condi tions prior to <br />construction. <br />4. pacate all existing utilities in the area of <br />work. <br />S. Mobilize all labor, equipment. " materials. <br />6. Deliver and store all equipment and materials <br />to the jab site. <br />7. Notify all utilities and other affected <br />parties prior to initiating construction. <br />(b) From 71 calendar days to 100 calendar days from the <br />effective date of Notice to Proceed. the CONTRACTOR <br />shall complete the following tasks <br />1. install all pipe and appurtenant items. <br />2. Perform all testing. <br />3, Restore all disturbed areas to their <br />preconstruction condition. <br />4. Correct all deficiencies noted by ENGINEER. <br />Crxrpletion of all tasks outlined above (i.e.. Subparagraphs a <br />and b) constitute Substantial Completion. <br />c) From 3V1 ,calendar days to 169 calendar days from <br />the effective date of Notice to Proceed, the <br />CONIRACTOR shall complete the following tasks: <br />1. Clean up project area.. <br />2. Remove all equipment and material from project <br />site. <br />3. Perform contract close-out procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, <br />b, and c) constitutes final completion. <br />FA -2 <br />