My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/05/2024
CBCC
>
Meetings
>
2020's
>
2024
>
03/05/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2024 11:25:20 AM
Creation date
4/30/2024 11:09:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/05/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acronyms: <br />DEP — Florida Department of Environmental Protection <br />F.A.C. — Florida Administrative Code <br />F.S. — Florida Statutes <br />FEMA — Federal Emergency Management Agency <br />TASKS and DELIVERABLES: <br />The Local Sponsor will provide detailed scopes of work or a letter requesting advance payment if authorized <br />by Attachment 2, for all tasks identified below, which shall include a narrative description of work to be <br />completed, a corresponding cost estimate and a proposed schedule of completion for the proposed work <br />and associated deliverables. Each scope of work shall be approved in writing by the DEP Project Manager <br />to be included into this work plan for reimbursement. <br />Task 1: Design <br />Task Description: The Local Sponsor will acquire professional services for the engineering and design of <br />the Project such as coastal engineering analyses, preparation of plans and specifications, physical and <br />environmental surveys, cultural resource surveys, design -level geotechnical services, sediment studies, inlet <br />studies, environmental analyses, orthophotography, plan formulations and for obtaining environmental <br />permits and other Project -related authorizations. The Local Sponsor will submit work products to the <br />appropriate State or Federal regulatory agencies as requested by the DEP Project Manager in order to be <br />eligible for reimbursement under this task. <br />Deliverable: Certification of Completion including documentation of submittal affirming that the final <br />design document was completed and submitted to the Department. For interim payment requests, a Task <br />Summary Report signed by the Local Sponsor must be submitted detailing work progress during the <br />payment request period. The Task Summary Report must include the dates and descriptions of all activities, <br />surveys and reports completed or in progress during the time period of the interim payment request. <br />Performance Standard: The DEP Project Manager will review the task deliverable and any associated <br />work products as necessary to verify they meet the specifications in the Grant Work Plan and this task <br />description. <br />Payment Request Schedule: Payment requests may be submitted after the deliverable is received and <br />accepted and may be submitted no more frequently than quarterly. <br />Task 2: Construction <br />Task Description: This task includes work performed and costs incurred associated with the placement of <br />fill material and/or the construction of erosion control structures within the Project area. Project costs <br />associated with eligible beach and inlet construction activities include work approved through construction <br />bids and/or construction -phase engineering and monitoring services contracts. Eligible .costs may include <br />mobilization, demobilization, construction observation or inspection services, physical and environmental <br />surveys, beach fill, tilling and scarp removal, erosion control structures, mitigation reefs, dune stabilization <br />measures and native beach -dune vegetation. Construction shall be conducted in accordance with any and <br />all State or Federal permits. The Local Sponsor will submit work products to the appropriate State or Federal <br />regulatory agencies as requested by the DEP Project Manager in order to be eligible for reimbursement <br />under this task. <br />Deliverable: Certification of Completion by a Florida -registered Professional Engineer with <br />documentation of submittal to the Department affirming the construction task was completed in accordance <br />with construction contract documents. For interim payment requests, a Task Summary Report signed by <br />DEP Agreement No. 19IR2, Amendment 2, Attachment 3-B, Page 2 of 3 96 <br />j <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.