Laserfiche WebLink
Work Order No. <br />Sandridge Restroom <br />Utility Improvements <br />EXHIBIT A — SCOPE OF WORK <br />The COUNTY desires to improve utilities at the Sandridge Golf Course restroom at Hole 6 which <br />is near the SW corner of the Hobart Park. There are no proposed improvements to the restroom <br />building. The utility connections will run through the SW corner of Hobart Park and connect to <br />the newly constructed restroom utilities. <br />Task 1— Preparation of Civil Plans <br />As part of this scope Consultant will design plans that show the utility improvements at the <br />existing Sandridge restroom which consists of water service, sanitary service, and Lift Station. <br />The proposed utilities for Sandridge improvements will connect to the Hobart Park restroom <br />utilities that are newly constructed. The utility connections will be verified by as-builts provided <br />by the Hobart Park contractor. Consultant will utilize the Topographic Survey provided by the <br />County for the preparation of the plans shown below. <br />Consultant will prepare a Demolition and Erosion Control Plan that will show the existing <br />conditions of the project area and the areas of disturbance for the proposed improvements. This <br />plan will also show the demolition of the existing utilities to the Sandridge restroom, existing <br />septic drain field and tank, and any clearing and grubbing required for utility installation. <br />Consultant will prepare a Utility Plan showing the existing utilities provided by the Sandridge Golf <br />Course Survey, County GIS Data, and as-builts. The Utility Plan will show the proposed two-inch <br />water service that will connect to the newly constructed two-inch water service at Hobart Park, <br />four -inch sanitary lateral to lift station, two-inch force main that will connect to the newly <br />constructed four -inch force main within the gravel roadway at Hobart Park, and location of the <br />new public Lift Station. Due to the installation of the Lift Station, it is assumed that electrical <br />service can be utilized from the existing restroom. Consultant will show a two-inch conduit line <br />to the existing restroom and will coordinate with the County for electrical load handling. <br />Consultant will prepare a Lift Station plan showing the design County Lift Station with details and <br />specifications that follow Indian River County Utility Design and Standards. <br />Consultant will prepare a Construction Detail Sheet that will incorporate any applicable details to <br />the proposed design. <br />There are no anticipated improvements to the existing Sandridge restroom and newly <br />constructed Hobart Park restroom. No grading or site changes are anticipated with the utility <br />improvements. <br />Page 2 of 5 <br />