My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-101
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 10:25:20 AM
Creation date
5/23/2024 10:24:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/07/2024
Control Number
2024-101
Agenda Item Number
8.G.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work 11 for Sandridge Restroom Utility Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. <br />Sandridge Restroom <br />Utility Improvements <br />area. Consultant will submit the plans and report prepared in the above tasks for the following permits: <br />Consultant will submit to the Indian River County Planning Department for administrative approval for <br />the restroom utility improvements and land disturbance impacts. <br />Consultant will submit for a Land Clearing Permit for the land disturbance impacts for the installation of <br />the force main. <br />Consultant will submit for a Tree Removal Permit for the impacts to trees for the installation of the force <br />main. <br />Consultant will submit for a Utility Construction Permit (UCP) for the potable water, sanitary sewer, force <br />main, and public Lift Station improvements. This application will contain the equivalent residential use <br />determination, projected water and sewer flows and associated plans. <br />Consultant will submit for a FDEP Application for Domestic Wastewater Collection/Transmission System <br />for the construction of the County Lift Station and force main. <br />Consultant will submit for a FDEP Onsite Sewage Treatment and Disposal System Permit for the removal <br />of the existing septic drain field and tank. <br />Due to the limited nature of the work, Consultant does not anticipate more than two (2) rounds of <br />comments from each of the agencies having jurisdiction above. Kimley-Horn will respond to up to two <br />(2) rounds of comments from the permitting jurisdictions above as part of this task. <br />In summary the following permits are anticipated: <br />Indian River County Administrative Site Plan Approval <br />Indian River County Land Clearing Permit <br />Indian River County Tree Removal Permit <br />Indian River County Utility Construction Permit for Potable Water and Sanitary Sewer <br />FDEP Application for Domestic Wastewater Collection/Transmission System <br />FDEP Onsite Sewage Treatment and Disposal System Permit <br />This scope does not include construction phase services. These can be provided as an additional <br />service. <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.