SECTION 00942 - Change Order Form <br />DATE OF ISSUANCE: 07/29/2021 <br />IRC -1505 <br />No. 01 <br />EFFECTIVE DATE: 09/21/2021 <br />OWNER: Indian River County <br />CONTRACTOR Halley Engineering Contractors, Inc. <br />Project: 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />OWNER's Project No. IRC -1505 OWNER'S Bid No. 2021018 <br />FM No.: 436379-1-54-01 & 436379-1-54-02 <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Incorporate Contractor's Proposal to re -design the foundations, substructure and superstructure of the <br />proposed bridge — 66th Avenue Over North Relief Canal. <br />The following terms and conditions related to the approval of the Contractor's proposal have been <br />agreed to by Indian River County (IRC) and Halley Engineering Contractors, Inc. (HEC): <br />IRC has reviewed the HEC proposal design concepts in conjunction with the Florida Department of <br />Transportation (FDOT) and has determined that the concepts are valid with respect to the Contract <br />Documents. <br />• IRC, HEC, FDOT agree that IRC will proceed with development of HEC's concepts, based upon the <br />following: <br />- Concept is based upon HEC's preliminary drawing dated 6/10/2021 (attached as Exhibit "A") <br />and letter dated 6/3/2021 (attached as Exhibit "B"). <br />- Reduction in the number of piling. <br />- Reduction in the number of bridge bents. <br />- Elimination of the transverse post -tensioning. <br />- Design refinement may result in additional construction detail modifications without affecting <br />the aesthetic view of the structure, provided the final design will meet the design criteria <br />shown in the plans. <br />• IRC will engage the original Bridge Engineer of Record — Wantman Group Incorporated, <br />(Subconsultant to ARCADIS) to prepare the revised design at a total cost of $ 55,000.00. HEC and IRC <br />agree that the redesign engineering cost will be deducted from the Contract. HEC accepted this <br />change as a lump sum contract and agrees that IRC is not responsible for any additional quantity <br />changes or overruns that the revised design may incur. <br />• IRC and HEC agree that the value of any collateral savings will be approximately the same as the costs <br />incurred by the IRC to process and implement HEC's proposed changes. Therefore, there will be no <br />net collateral savings to be shared by IRC and HEC. <br />• The payment structure for the bridge items listed in Exhibit "C" will be changed to lump sum. The <br />lump sum amount for the new pay item will be determined by adding together all the total pay items <br />valued for the bridge pay items provided in the original contract as detailed in Exhibit "C" and <br />PAGE 1 OF 4 76 <br />