My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-094
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 10:05:08 AM
Creation date
6/13/2024 9:59:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/23/2024
Control Number
2024-094
Agenda Item Number
8.U.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 6 Amendment No. 2 for Professional Services s
for Oslo Rd Water Treatmen Plant Improvement
Document Relationships
2024-094A
(Cover Page)
Path:
\Official Documents\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations are to be limited to spot checking, selective measurement, and similar methods of <br />general observation of the Work based on Consultant representative's exercise of professional <br />judgment. Based on information obtained during such visits and such observations, Consultant's <br />representative will evaluate whether Contractor's work is generally proceeding in accordance with <br />the Contract Documents, and Consultant will keep Owner informed of the general progress of the <br />Work. <br />Consultant's inspector will prepare field reports of each site visit describing observations witnessed <br />during site visits. Consultant will prepare field reports for the additional thirty (30) site visits <br />performed through project completion. <br />The purpose of Consultant representative's site visits will be to enable Consultant to better carry <br />out the duties and responsibilities specifically assigned in this Agreement, and to provide the <br />OWNER a greater degree of confidence that the completed Work will conform in general to the <br />Contract Documents. Consultant shall not, during such visits or as a result of such observations of <br />Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall <br />the Consultant have authority over or responsibility for the means, methods, techniques, equipment <br />choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for <br />safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to <br />comply with laws and regulations applicable to Contractor's furnishing and performing the Work. <br />Consultant will recommend to the Owner that Contractor's work be disapproved and rejected while <br />it is in progress if, on the basis of such observations, Consultant believes that such work will not <br />produce a completed Project that conforms generally to Contract Documents. <br />TASK 2 — PROGRAMMING AND INTEGRATION — NO CHANGES <br />TIME SCHEDULE <br />Consultant's original proposal anticipated construction duration of twenty-four (24) months will be <br />required. Amendment 1 assumed a revised final completion date of May 17, 2024. This <br />Amendment 2 assumes a final completion date of August 2024. The updated construction duration <br />is thirty-seven (37) months. <br />FEESCHEDULE <br />We will provide these services in accordance with our Agreement for Professional Services for <br />Water Plant and Water Resources Engineering Services — RFQ 2019070, dated November 5, 2019, <br />by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services on a lump sum fee basis as follows: <br />Task No. Task <br />WO #6(Previously Authorized <br />Amendment 1 <br />Amendment 2 <br />Revised Total <br />Task I Construction Phase Services <br />$865,774 <br />$263,133 <br />$51,359 <br />$1,180,266 <br />Task 2 Programming and Integration <br />$356,772 <br />$0 <br />$0 <br />$356,772 <br />Total Lump Sum Fee <br />$1,222,546 <br />$263,133 <br />$51,359 <br />$1,537,038 <br />K: (WPB CivillGenerallBlack0oridaVRCU10slo WTP Construction Phase (Amendment 2120240325 -Amendment 2 Oslo CPS.doc Page 2 oj6 <br />Indian River County Utilities Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.