Laserfiche WebLink
SECTION 00520 Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) and Timothy Rose Contracting, Inc. (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />This project is located in Vero Beach, FL on 1St Street SW between 35th Avenue and <br />3711 Drive SW. Phase I will include replacement of the existing 60 -inch corrugated <br />metal pipe (CMP) with reinforced concrete pipe (RCP) under the Waters Edge <br />Neighborhood entrances at 36th Court SW and 37th Drive SW. Phase 11 will include <br />replacement of a 96 -inch CMP and 24 -inch CMP under 1st Street SW with a pre -cast <br />concrete box culvert and 24 -inch RCP respectively. Ancillary work includes site <br />work, canal excavation, embankment stabilization, sod, roadway milling and <br />resurfacing, striping, curb, and guardrail replacement. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only <br />a part is generally described as follows: <br />Project Name: WATERS EDGE CULVERT REPLACEMENT <br />County Project Number: IRC -2201 <br />Bid Number: 2024046 <br />Project Address: 3500 111 Street SW, Vero Beach, FL 32968 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the Contract Documents are of the essence of the Contract. <br />Agreement (Public Works) REV 04-07 - 00520 - 2 <br />F: Public Works\ENGINEERING DIVISION PROJECTS\2201 Waters Edge Culvert Replacement\1-Admin\Bids\Bid Documents\Bid Docs\DIV 0_1_Bid and Contract Doc_ Template_20220729.docx <br />