Laserfiche WebLink
C> <br />40 <br />2. Any pay items for which a specific item is not included shall be included in the price of the <br />pay item to which it pertains or is associated. <br />3. Any items not shown or omittcd that are required for a complete installation shall be <br />furnished and installed by the CONTRACTOR at no additional cost to the OWNER.. <br />4. The prices shall include all labor, materials, tools, equipment required to complete the work. <br />S. No additional payment will be made for well pointing or other methods of dewatering <br />excavations. <br />6. Payment for repair and replacement of existing utilities will be included in the unit price or <br />lump sum bid amount for the related new construction bid item. <br />K. Fngit,.srrmg apd Layaut <br />Engineering, and layout work shall comply with Section 5-7 of the Florida D.O.T. Standard <br />Specifications for Road and Bridge Construction (1996). <br />2. The CONTRACTOR will famish all construction staking for the project. All staking from <br />control will be under the supervision of a Florida Registered Land Surveyor. <br />3. 'Che cost of performing engineering and layout work described above shall be included in <br />the contract unit prices for the various items of work to which it is incidental. No separate <br />payment will be made for surveying or engineering. <br />SUPPLEMENTARY CONDITIONS <br />SC - 4 <br />