Laserfiche WebLink
4.ni inn of Ce nLraC# n^mlment,5 alttL fle <br />4.1. Before submitting a Bid, .uch Bidder must (a) examine the Contract Documents <br />thoroughly: (b) visit the site to familiarize himself with local conditions that may <br />in any manner affect cost, progress or performance of the Work; (c)familiarize <br />himself with federal, state and local laws, ordinances, rules and regulations that may <br />in any manner affect cost, progress or performance of the Work; and (d) study and <br />carefully correlate Bidder's observations with the Contract Documents. <br />4.2. Reference is made to the Supplementary Conditions for the identification of those <br />reports of investigations and tests of subsurface and latent physical conditions at die <br />site or otherwise affecting cost, progress or performance of the Work which have <br />been relied upon by Engineer in preparing the Drawings and Specifications. <br />Before submitting his Bid each Bidderwill, at his own expense, make such additional <br />investigations and tests as the Bidder may deem necessary to determine his Bid for <br />performance of the Work in accordance with the time, price and other terms and <br />conditions of the Contract Documents. <br />4.3. On request Owner will provide each Bidder access to the site to conduct such <br />investigations and tests as cacti Bidder deems necessary for submission of his Bid. <br />4.4. The lands upon which the Work is to be performed, rights-of-way for access thereto <br />and other lands designated for use by Contractor in performing the Work are <br />identified in the Supplementary Conditions, General Requirements or Drawings. <br />4.5. The submission of a Bid will constitute all incontrovertible representation by the <br />Bidder that he has complied with every requirement of this Article 4 and that the <br />Contract Documents are sufficient in scope and detail to indicate and convey <br />understanding of all terms and conditions for performance of the Work. <br />�. relations <br />All questions about the meaning, or intent of the Contract DoCttnlent5 shall he submitted to <br />Engineer in writing. Iteplics will be issued by Addenda ,nailed or delivered to all parties <br />recorded by Engineer as having received the Bidding Documents, Questions received less <br />than ten days prior to the date for opening of Bids will not be answered. Only questions <br />answered by formal written Addenda will he binding. Oral turd other interpretations or <br />clarifications will be without legal effect. <br />6ffid S.ecu ty <br />o.1. Bid Security shall he made payable to Owner, in the amount specified in the Bid <br />Form and in the form of a certified check. cashier's check, treasurer's check or batik <br />drail of any national or state bank or a Bid liond(on the form attached) issued by a <br />surety meeting the rcquircincras of paragraph 5.1 of the general Conditions. <br />6.2. The Bid Scantly cif the Suctctsful Ridilct will be rcWne^d 'until such lliddcr 114% <br />executed the Agrmuctn and furl ,%he) the wgtiiri-A C'011118cl SL""4', ' wttcrt it>~rit it <br />will be rttcirnod, it the 1liddcr l:til► tcti execate awl drhr rt the AV..tc^crutttt <br />t* ir4[t e-tletNs riitsttttt}R% <br />0 <br />