Laserfiche WebLink
EXHIBIT "A" <br />ARCHITECTURAL PROFESSIONAL SERVICES PROPOSAL <br />FOR THE IRC EOC WAREHOUSE ADDITION <br />Architectural/Engineering Professional Services shall be provided to support the design efforts to <br />provide a new, +/- 8,350sf Single -Story Pre -Engineered Metal Buildings Addition to the existing On - <br />Site Warehouse located on theIndian River County Emergency Operations Campus at 4225 43rd <br />Avenue in Vero Beach, FL. Our Professional Services efforts would encompass the design and <br />development of drawings and specifications, procurement, permitting, and construction <br />administration. <br />Proposed Scope of Professional Services: <br />Architectural/Engineering Professional Services shall consist of Architectural and Limited Interiors <br />Services, along with Structural Engineering; Mechanical, Electrical, Plumbing and Fire Protection <br />Engineering; including routing and boxes for AV/IT and Cost Estimating Services for Schematic <br />Design update, l00% Design Documents, 50% Construction Documents, & 9o% Construction <br />Documents. <br />The project is a new a new Single -Story Pre -Engineered Metal Buildings Addition and will include the <br />following: <br />• Warehouse Addition of +/- 8,350sf. <br />• Breezeway Addition of +/- 5,000sf between the existing Warehouse and the Proposed <br />Warehouse Addition. <br />• A Private Office Space. <br />• Open Office Area for +/- 10 Workstaions <br />Mens and Womens Restroom with Showers. <br />• An Interior Secure Medical Storage Room. <br />• Secured Unconditioned Storage Space in the remaining portion of the Warehouse Addition. <br />Preliminary Project Budget: <br />As previously provided and approved by the County, the estimated construction budget per Blue Cord <br />Professional Services, dated 09/01/2023 is approximately $2.0 million, excluding Site work. We <br />recommend that county hold an additional 1o% for Furniture, Fixtures and Equipment. This budget <br />does not include environmental impacts as we recommend contracting with your environmental <br />consultant to confirm any potential environmental impacts. <br />Preliminary Project Schedule: <br />The goal of the project is to have construction commence on or about May of 2025, with a target <br />completion date on or about January of 2026. However, the actual timing to commence construction <br />and field improvements is contingent upon the weather conditions at the time of project award and <br />mobilization. Considering this, we have outlined the following preliminary project schedule. Please <br />note that this schedule is based on the information available to us at present and is subject to <br />adjustments during site plan approval, design, bidding, permitting, and construction phases. <br />• Award of Contract to Professional: <br />• Site Approval <br />• Schematic Design/Planning <br />• Design Development <br />• Construction Documents/Site Permitting <br />• Procurement/Permitting/Award: <br />• Construction <br />August 2024 <br />December 2024 <br />October 2024 <br />December 2024 <br />February 2025 <br />March/April 2025 <br />May 2025 to January 2026 <br />