Mr. Himanshu Mehta <br />June 21, 2024 <br />Page 2 <br />• Install approx. 150 feet of 14 -inch SDR 17 header piping from the tie-in location to the flare <br />station inlet pipe. <br />• Tie-in at existing air -line pipe and install approx. 350 feet of 2 -inch SDR 9 air -line piping. <br />HDPE air -line piping will daylight and connect to the flare skid air -line piping via a flanged <br />connection. <br />• Tie-in at existing condensate line and install approx. 350 feet of 2 -inch SDR 11 condensate <br />piping. HDPE condensate piping will daylight and connect to the flare skid condensate lines <br />via a flanged connection. <br />• Install approx. 120 feet of 2 -inch and 4 -inch SDR 11 conduit piping for the RNG plant facility <br />and leachate evaporator. <br />• Install approx. 250 feet of 8 -inch SDR 11 pipe for the gas line to the leachate evaporator and <br />pig launching station. The pig launching station will consist of a stainless-steel riser with a <br />flange, two 8 -inch HDPE port valves and two valve boxes with lids. All internal fusion beads <br />will be removed from the HDPE pipe and elbows will be sweeping. The 8 -inch pipe will <br />connect to an existing 8 -inch pipe. <br />• Install approx. 250 feet of 12 -inch SDR 11 pipe for the gas line to the future RNG facility <br />pipeline and pig launching station. The pig launching station will consist of a stainless-steel <br />riser with a flange, two 12 -inch HDPE port valves and two valve boxes with lids. All internal <br />fusion beads will be removed from the HDPE pipe and elbows will be sweeping. The 12 -inch <br />gas line will terminate with a blind flange since the gas line to the RNG facility is not currently <br />installed. <br />• All hardware will be stainless steel. Backing rings will be stainless steel where HDPE pipe <br />meets with stainless steel pipe. Backing rings where HDPE pipe meets with HDPE pipe will <br />be ductile iron. <br />• HDPE pipe will be pressure tested at 20 psi for one hour. <br />ASSUMPTIONS <br />The scope of work is based on the following assumptions: <br />• The scope of work or cost does not include the electrical installation scope of work. That <br />scope of work is still under review and will be submitted in a separate proposal. <br />• Concrete encasement of the valve boxes at both the 8 -inch and 12 -inch pig launching <br />stations is not included in this scope of work. SCS -FS can provide concrete work at an <br />additional cost. <br />• Compaction testing will be performed by others. SCS -FS can provide compaction testing at <br />an additional cost. <br />• Pipe pressure testing will be performed at 20 psi for one hour. <br />• SCS -FS does not provide performance guarantees or warranties on equipment that SCS -FS <br />did not purchase. Warranties for equipment supplied by SCS -FS are based on the <br />manufacturer's terms and conditions. <br />• At a minimum, SCS -FS will have site access and permission to work Monday through <br />Saturday from 7:00 AM to 7:00 PM. <br />• The work area will be accessible and free of obstructions or other work activities performed <br />by others that could delay the installation process. <br />• SCS -FS may limit or restrict access to any and all traffic adjacent to the work area as needed. <br />• Any additional drug testing or personnel background requirements to work for this project - <br />those costs need to be passed through. Also, consider the time it takes to perform these <br />checks/tests. <br />