My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-157
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 2:21:41 PM
Creation date
7/18/2024 2:20:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/02/2024
Control Number
2024-157
Agenda Item Number
8.Z.
Entity Name
AtkinsRealis USA, Inc.
Subject
Engineering Services Work Order No. 5 for Collection Systems Action Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ExhibitA <br />Collection System Action Plan Scope of Services <br />IIIXAtkinsRealis <br />3.2 Draft Action Plan <br />CONSULTANT shall prepare a pipe assessment, repair, and replacement action plan in <br />accordance with Rule 62-600.705(2) F.A.C. to demonstrate how the COUNTY will <br />mitigate sanitary sewer overflows and underground pipe leaks to the extent <br />technically and economically feasible. Plan will include a 5 -year outlook for all <br />collection/transmission systems under the COUNTY's control including, but not <br />limited to, gravity sewers, manholes, lift and vacuum stations, force mains and <br />vacuum lines and tanks. <br />3.2.1 Collection /Transmission System Description, Inventory & Data <br />Action Plan will contain background information, including but not limited to current <br />and projected future flows, population served, management and personnel, assets, <br />and relevant geologic and climatic data. Additional system information including GIS <br />details, overflows, bypasses, odor complaints and corrosion data will also be noted. <br />COUNTY GIS staff will prepare a map and inventory of the system. <br />3.2.1 Record Keeping <br />CONSULTANT will assist COUNTY staff to establish clear recordkeeping procedures for <br />all content associated with the Action Plan. Procedures will be detailed in the Action <br />Plan and shared with the appropriate staff members. <br />3.2.2 System Inspections/Evaluations <br />Action Plan will include details of recent inflow and infiltration studies and leakage <br />surveys conducted on the system. Details of historic evaluations will be included <br />where available and appropriate. CONSULTANT will document the COUNTY's current <br />standard procedures for completing system inspections, evaluating results and <br />identifying areas of improvement and projects to be completed. Procedures will be <br />evaluated based on industry best practices and any potential improvements, if noted, <br />will be presented to the COUNTY for consideration. CONSULTANT will assist COUNTY <br />staff with preparing an inspection schedule. <br />3.2.3 Adaptive Maintenance & Repair Plans <br />Action Plan will summarize general programs and protocols regarding routine <br />maintenance, cleaning activities and emergency repairs. CONSULTANT will review <br />and update up to 15 SOPs associated with routine maintenance, cleaning activities <br />and emergency repairs of the collection/transmission system. Procedures will be <br />evaluated based on industry best practices and improvements will be recommended, <br />as needed. Associated capital improvement and R&R projects identified within this <br />Action Plan, in the current Capital Improvement Plan along with the current Master <br />Plan will be listed. <br />3.2.4 Sewer Programs <br />CONSULTANT will review and describe COUNTY's current fats, oils and grease (FOG) <br />program, root control program and any other program in place to limit the presence <br />of debris and blockages in the collection/transmission system. Programs will be <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.