My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-157
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 2:21:41 PM
Creation date
7/18/2024 2:20:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/02/2024
Control Number
2024-157
Agenda Item Number
8.Z.
Entity Name
AtkinsRealis USA, Inc.
Subject
Engineering Services Work Order No. 5 for Collection Systems Action Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ExhibitA <br />Collection System Action Plan Scope of Services <br />0"AtkinsR6alis <br />• COUNTY has recently performed inflow/infiltration studies and/or leakage surveys and <br />can provide documentation on the details and results of these studies and studies <br />historically completed. <br />• COUNTY has a FOG program in place at the time of this scope approval. <br />• COUNTY has a root control program in place at the time of this scope approval. <br />• COUNTY has an established and thorough GIS system that identifies <br />collection/transmission system components and their attributes. This system can <br />produce a map and inventory of the collection/transmission system. <br />• All additional work to complete a full inventory of the collection/transmission system <br />within GIS will be performed by COUNTY staff. <br />• CONSULTANT will not be summarizing results of all recent and historical CCTV data but <br />rather using the most recent data to assist COUNTY staff with setting up a system of <br />evaluating this data and recommending improvements where needed. <br />• COUNTY has an established Maintenance System (Cartegraph) used to schedule and track <br />maintenance work orders and records. This system is used regularly and in good standing. <br />• COUNTY is contracting an Engineer to complete a Master Plan that includes wastewater <br />and collections systems along with a resiliency evaluation. The Action Plan may refer to <br />work to be completed in the Master Plan. <br />Exclusions <br />The following items are not included in the scope of this project: <br />• Permitting services <br />• Preparation of bidding documents <br />• Bidding services <br />• Construction services <br />• Survey services <br />• Preparation of Record Drawings <br />• GIS services & data input <br />• Public Meetings <br />• Resiliency evaluation <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.