Laserfiche WebLink
Alternative 2 - Buffered, BigycleaLane Adjacent to Sidewalk <br />*Alternative does not fit <br />within 60' of assumed <br />existing ROW in Rural <br />District 68' of additional <br />ROW is needed. This <br />assumes that stormwater <br />will be stored off-site. <br />r. <br />M <br />22' <br />Provide safe travel <br />Minimize new <br />Provide Provide multimodal Maintain <br />multimodal access to properties multimodal <br />options for people <br />impervious areas. <br />travel options for along CR 512. access to <br />walking and <br />Provide mobility <br />Match the Number of <br />&10 <br />biking along CR <br />that emphasizes the <br />Maintain 45 MPH <br />Vehicular Travel Lanes <br />along and across CR 512. <br />.' <br />use of non -auto <br />Target Speed <br />law <br />CR 512. Serve existing and <br />travel speeds <br />modes. <br />future local <br />Provide lighting. <br />businesses. <br />*Alternative does not fit <br />within 60' of assumed <br />existing ROW in Rural <br />District 68' of additional <br />ROW is needed. This <br />assumes that stormwater <br />will be stored off-site. <br />r. <br />M <br />22' <br />Key: How Well Do the Alternatives Meet the Needs: • = Meets the Need Well = Moderately Meets the Need <br />20 <br />O = Does Not Meet the Need <br />Note: FDOT has a project along CR 572 east of l-95 with an auxiliary lane and bike lane reconfiguration. Both alternatives would need to be transitioned to the future configuration under l-95. <br />Provide safe travel <br />Minimize new <br />Provide Provide multimodal Maintain <br />multimodal access to properties multimodal <br />options for people <br />impervious areas. <br />travel options for along CR 512. access to <br />walking and <br />Provide mobility <br />Match the Number of <br />people travelling properties along <br />biking along CR <br />that emphasizes the <br />Maintain 45 MPH <br />Vehicular Travel Lanes <br />along and across CR 512. <br />512; Maintain safe <br />use of non -auto <br />Target Speed <br />with Needs (4 Lanes) <br />CR 512. Serve existing and <br />travel speeds <br />modes. <br />future local <br />Provide lighting. <br />businesses. <br />O O O <br />O <br />O <br />• • 1 <br />1 <br />• <br />1 <br />• <br />i <br />4s�i� 'I <br />A <br />Key: How Well Do the Alternatives Meet the Needs: • = Meets the Need Well = Moderately Meets the Need <br />20 <br />O = Does Not Meet the Need <br />Note: FDOT has a project along CR 572 east of l-95 with an auxiliary lane and bike lane reconfiguration. Both alternatives would need to be transitioned to the future configuration under l-95. <br />