Laserfiche WebLink
6706-050 <br />12. Completion: a. Before ENGI NEER issues a Certificate <>f Substantial Completion, submit <br />c. <br />to CONTRACTOR a li st of observed i tems requiring compl etion or <br />correction. b. Cond uct f i nal Inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a f i nal list of Items to be completed or <br />corrected. <br />c. Veri fy that all Items on final list have been completed or corrected and <br />make recommendations to ENGINEER concerning acceptance. <br />LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEEF:, Resident Project <br />Representative: <br />1 . Shall not authorize any devi ati on from the··Contract Documents or approve <br />any substitute material s or equipment. <br />2. Shall not exceed limi tations on ENGI NEER'S authority as set forth in the <br />Contract Documents. <br />3. Shall not undertake any of the responsibilities of CONTRACTOR, <br />Subcontractors or CONTRACTOR'S s uperintendent, or expedite the Work. <br />4 . Shall not advise on or issue directions re l ative to any aspect of the means, <br />methods, techniques, sequences or procedures of construction unless such ls <br />specifically called for in the Contract Documents. <br />5. Shall not advi se on or i ssue directi ons as to safety precautions and programs <br />in connection with the Work. <br />6. Shall not authorize OWNER to occupy the.'.Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests. <br />END OF SECTION <br />00800 42