Laserfiche WebLink
r <br />PART 1 - <br />1.01 <br />(UGC01201.FMT) :aa <br />SECTION 01201 <br />PRECONSTRUCTION CONFERENCE <br />GENERAL <br />REQUIREMENTS INCLUDED <br />and administer the <br />and shall perform the A. Engineer shall schedule <br />preconstruction conference <br />following duties: <br />1. Prepare agenda for meeting. 2 . Give notice of meetin<; three days in advance <br />of meeting date. 3. Make physical arrangements for meeting . <br />4. Preside at meeting. <br />5. Record the minutes which shall include all <br />significant proceedings and decisions. <br />6. Reproduce and distribute copies of minutes <br />within fifteen (15) working days after <br />meeting . Minutes shall be distributed to all <br />participants in the meeting and to all parties <br />affected by decisions made at the meeting. <br />1.02 RELATED REQUIREMENTS <br />A. Section 01000: Description of Work. <br />B . Section 01311: Construction Schedule. <br />c. Section 01340: Shop Drawings, Product Data and <br />Samples. <br />o. Section 01720: Project Record Documents. <br />E. Section 01730: Operating and Maintenance Data . <br />1.03 PRECONSTRUCTION CONFERENCE <br />A. Engineer will schedule meeting with Contractor, <br />Owner and other affected parties. <br />B. Location of the precon struction meeting: the <br />project site or a nearby office to be selected by <br />Owner/Engineer. <br />01201-1