Laserfiche WebLink
c) From 201 calendar days to 240 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: -I. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perfom1 contract close-out procedures. <br />Completion of all tasks outlined above (i .e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />6. The following doc_uments are attached to and made a condition of this Bid: <br />(a) <br />(b) <br />Schedule of Bid Items. <br />Required Bid Security in the Form oflnsurance. <br />7. Communications concerning this Bid shall be addressed to: <br />Aaron J. Bowles. P.E. <br />Environmental Engineer <br />(56 J) 567-8000 X 1822 <br />The address of Bidder indicated below is as follows: <br />Tri-Sure Corporatjoo <br />P.O. Box 653 <br />Auburndale , Fl 33823 <br />8. The terms used in this Bid which arc delined in the General Conditions of the <br />Construction Contract include as part of the Contract Documents have the <br />meanings assigned to them in the General Conditions. <br />SUBMITTED ON Se pte mbe r 6'--'--"-2""00,,.,0,<._ ____ _ <br />003 10-4