Article 3 . CONTRACT TIME . <br />3 .1 The work will be completed in accordance with the <br />following time frame . <br />(a ) Within 45 calendar days from effective date of <br />Not i ce to Proceed , CONTRACTOR shall compl ete the <br />following task s : <br />(b ) <br />1. <br />2. <br />3 . <br />4 . <br />5 . <br />6 . <br />7 . <br />Obtain all necessary permits . <br />Receive approved shop drawings for all <br />materials and equipment to be utilized in the <br />job . <br />Perform all <br />documentation <br />construction . <br />photographic recording <br />of conditions prior <br />and <br />to <br />Locate a ll existing util ities in the area of <br />work . <br />Mobil ize all labor , equipment, and materials . <br />Deliver and store all equipment and materials <br />to the job site. <br />Notify a ll utilities and other affected <br />parties prior to initiating construction . <br />From 46 calendar days to 200 calendar days <br />the effective date of Notice to Proceed, <br />CONTRACTOR shall complete the following tasks : <br />from <br />the <br />1. Install all pipe and appurtenant items . <br />2 . Perform all testing . <br />3 . Restore all disturbed areas to their <br />4. <br />preconstruction condition . <br />Correct a ll deficiencies noted by ENGINEER . <br />Completion of all tasks outlined above (i.e., Subparagraphs a <br />and b) constitute Substantial Completion. <br />c) From 201 cal endar days to 240 calendar days from <br />the effective date of Notice to Proceed , the <br />CONTRACTOR shall complete the following tasks: <br />1. <br />2. <br />3 . <br />Clean UD project area. <br />Remove all equipment and material <br />project site. <br />Perform contract close-out procedures. <br />from <br />Completion of all tasks outlined above {i.e., Subparagraphs <br />a, b, and c) constitutes final completion. <br />l·A-2