Laserfiche WebLink
6706-050 <br />2.7. Before any Work at the site is started, CONTRACTOR shall deliver to OWNER, <br />with copies to ENGINEER and each additional Insured identified in Article 5 of the <br />Supplementary Conditions, certificates of Insurance (and other evidence requested <br />by OWNER) which CONTRACTOR ls required to purchase and maintain In <br />accordance w i th the requirements of Article 5. <br />ARTICLE 3. CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />SC-3.1. <br />Add a new paragraph immedlataly after Paragraph 3 .1. of the General Conditions <br />which Is to read as follows: <br />3.1.1. Each and every provisi on of l aw and c l ause required by law to be Inserted In <br />these Contract Documents shall be deemed to b9 Inserted herein, and they shall be <br />read and enforced as though It were Incl uded herein, and If through mistake or <br />otherwise, any such provision Is not Inserted, or If not correctly Inserted, then upon <br />the application of either party, the Contract Documents shall forthwith be <br />physically amended to make such insertion. <br />ARTICLE 4. AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL <br />CONDITIONS; REFERENCE POINTS <br />SC-4.1. <br />Add a new paragraph Immediately after paragraph 4 .1. of the General Conditions <br />which Is to read as follows: ;. <br />~ <br />4 .1 . 1. If all lands and rights-of-way are not obtained as herein contemplated before <br />construction begins, CONTRACTOR shall begin the Work upon such land and <br />rights-of-way as OWNER has previously acquired. <br />SC-4.2. <br />Add a new paragraph immediately after paragraph 4.2. 1 .1 of the General <br />Conditions which i s to read as fo llows: <br />00800-4