ED <br />j performed in contrast with the planned progress of performance of such work, as depicted on the original <br />Construction Schedule and all updates and/or revisions thereto as reflected in the updated and/or revised <br />Construction Schedule last submitted prior to submittal of each such monthly update and revision. Each such update <br />and/or revision to the Construction Schedule shall be submitted to the Architect -Engineer in duplicate. Failure of the <br />Contractor to update, revise, and submit the Construction Schedule as aforesaid shall be sufficient grounds for the <br />Architect -Engineer to find the Contractor in substantial default and certify to the Owner that sufficient cause exists <br />to terminate the Contract or to withhold payment to the Contractor until a schedule update acceptable to the <br />Architect -Engineer is submitted. <br />2.1.4 Cost Control Sub System The operation of this subsystem shall provide sufficient timely data and detail to permit the <br />Construction Team to control and adjust the Project requirements, needs, materials equipment and systems by building and <br />site elements so that Construction will be completed at a cost which, together with all other Project costs, will not exceed the <br />maximum total Project budget. Requirements of this subsystem include the following submissions at the following phases of <br />the Project: <br />Estimate i <br />(a) At Completion of 100% Construction Documents Phase for Each Item of Bid Package. <br />(b) At establishment of the Guaranteed Maximum Price. <br />2.1.5 ProqectAccountini!Subsysteni The operation of this subsystem shall enable the Construction Team to plan effectively and to <br />monitor and control the funds available for the Project, cash flow, costs, change orders, payments, and other major financial <br />factors by comparison of budget, estimate, total commitment, amounts invoiced, and amounts payable. This subsystem will be <br />produced and updated monthly and includes the following reports which together will serve as a basic accounting tool and an <br />audit trail. This report will also provide for accounting by building and site element. <br />(a) o tc Sta .s R p,2rt presenting the budget, estimate and base commitment (awarded contracts and purchase orders) <br />for any given contract or budget line item. It shall show approved change orders for each contract which when <br />added to the base commitment will become the total commitment. Pending change orders will also be shown to <br />produce the total estimated probable cost to complete the work. <br />(b) Aayment Status Report showing the value in place (both current and cumulative), the amount invoiced (both <br />current and cumulative), the retained, the amount payable (both current and cumulative), and the balance remaining. <br />A summary of this report shall accompany each pay request. <br />(c) A Detailed Status Repo rt showing the complete activity history of each item in the project accounting structure. It <br />shall include the budget, estimate and base commitment figures for each contract. It shall give the change order <br />history including change order numbers, description, proposed and approved dates, and the proposed and approved <br />dollar amounts. It shall also show all pending or rejected change orders. <br />(d) A Cash Flow Diagram showing the projected accumulation of cash payments against the Project. Cash flow <br />projections shall be generated for anticipated monthly payments as well as cumulative payments. <br />(e) A Job Ledger shall be maintained as necessary to supplement the operation of the Project accounting subsystem. <br />The job ledger will be used to provide Construction Cost accountability for general conditions work, on-site <br />reimbursable expenses and costs requiring accounting needs. <br />2.2 Fmiect Manual <br />(1) Upon award of contract, the Contractor shall develop a draft comprehensive Project Manual describing the services <br />set forth in this Contract. This shall provide a plan for the control, direction, coordination and evaluation of work <br />performed throughout the project organization including identification of key personnel, responsibilities of <br />Contractor, Owner and Architect -Engineer; work flow diagrams; and strategy for bidding the work. The Project <br />Manual shall be updated as necessary throughout the design, construction and Owner Occupancy phases. Five (5) <br />copies of the Project Manual and any updates shall be submitted to the Owner and Architect -Engineer. In <br />developing the Project Manual, the Contractor shall coordinate with the Owner and the Architect -Engineer. <br />