Laserfiche WebLink
s <br />w <br />40 <br />Contract #SD624AA <br />DISTRICT to model the IRFWCD. On December 31, 2000, the model will be complete <br />and delivered to DISTRICT for master planning development. Development of the plan <br />shall include maximum use of all available data, including previously completed and <br />ongoing stormwater studies within the project area. <br />I -C Preliminary development of alternatives: <br />A steering committee, consisting of COUNTY, IRFWCD, the City of Vero Beach and <br />DISTRICT, shall be formed to provide oversight of the master planning processes <br />described in this document. The committee shall meet when required to track progress of <br />the master plan and provide guidance in the stormwater improvement alternative plan <br />development. Upon request from the committee, the Consultant shall attend committee <br />meetings. The major task of the committee will be to discuss stormwater improvement <br />alternatives for the watershed. From these discussions, a list of possible properties <br />suitable for regional stormwater treatment facilities within the watershed area shall be <br />developed by the committee and documented by the Consultant. <br />I -D Agency Coordination (by Consultant) <br />Initial workshop liaison with the following agencies is required: <br />Indian River Fauns Water Control District <br />St. Johns River Water Management District <br />Florida Department of Environmental Protection <br />US Army Corps of Engineers <br />Indian River County Environmental Planning <br />Indian River County Utilities Dept. <br />Indian River County Public Works Dept. <br />Florida Game and Freshwater Fish Commission <br />US Fish and Wildlife Service <br />Indian River County Soil and Water Conservation District <br />USDA — Natural Resources Conservation Service (NRCS) <br />Indian River County Stormwater Working Group <br />City of Vero Beach Public Works <br />Indian River County Mosquito Control District <br />Indian River Lagoon National Estuary Program <br />Indian River County Parks & Recreation Committee <br />Pelican Island Audubon Society <br />Task No. 2, Compilation of the data: <br />The data required for the models developed by ECT and DISTRICT shall be compiled into a <br />report by the Consultant. Mapping and Inventories of the IRFWCD drainage system shall be <br />included in the report. Mapping and inventories developed will be compatible with COUNTY's <br />computer system AUTOCAD Release 15 or mapping and inventories shall be prepared utilizing <br />existing digital mapping and Geographic Information Systems (GIS-Arcinfo and ArcView) data <br />available from COUNTY and DISTRICT. Mapping for the basin shall be developed showing: <br />Page 12 of 19 <br />