Laserfiche WebLink
EXAMB9ATION OF SITE PI ANS CPFCImCAT1ONC RFCI❑ ATORC PFRA ITC <br />The Bidder is required, before submitting his proposal, to visit the site of the proposed work <br />and familiarize himself with the nature and the extent of the work and any surface and <br />subsurface conditions that may in any manner affect the work to be done, and the equipment, <br />materials, and labor required, and the cost thereof. Bidder is also required to examine <br />carefully the Plans, Specifications, Contract Documents, including the Regulatory Permits <br />and to inform himself thoroughly regarding any and all conditions and requirements that may <br />in any manner affect the work to be performed under the Contract. Ignorance on the part of <br />the Contractor will in no way relieve him of the obligations and responsibilities assumed <br />under the Contract. No information derived from maps, drawings, specifications, or from <br />the Engineer, or his assistants, shall relieve the Contractor from any risk or from fulfilling <br />all terns of the Contract. <br />8. LNTERPRFTATION OF THE APPROXIMATE OI IANTITIFP The Bidder's attention is <br />called to the fact that any estimate of quantities of work to be done and materials m be <br />furnished under the Specifications as shown on the Bid Schedule, or <br />elsewhere, is approximate only and not guaranteed. The owner does not assume any <br />responsibility that the final quantities shall remain in strict accordance with the estimated <br />quantities, nor shall the Contractor plead misunderstanding or deception because of such <br />estimate ofquantities or of the character, location ofthe work, or other conditions pertaining <br />thereto. <br />9. EAMTYJARITVWIT141AWS The Bidderis assumed to be familiar with and shall comply <br />with all Federal, State and Local laws, ordinances, mles, codes, and regulations that may <br />affect the work. Ignorance on the pan of the Bidder will in no way relieve him from the <br />responsibility of compliance therewith. All work and materials shall comply with those <br />I. <br />10. COMMENCEMENT AND COM P1 FTION OF WORK- The Contractorwill be required <br />to commence work under this Contract within twenty (20) calendar days after the date of <br />receipt by him ofthe Notice to Proceed, and to complete the work ready for use not more <br />than ONF 1B MORED TWF r1701 calendar days from and after the starting date <br />established in the notice to proceed. The time stated for completion shall include final clean. <br />up ofthe premises. TIMF IC Of THE pCGFNCF, Working days me defined as Monday <br />through Friday, excluding Saturday and Sunday and County Holidays. The hours will be <br />fiom7AMto7PM. No work shall commence before 7 AM or continue after? PM. County <br />Holidays are: New Years Day, Good Friday, Memorial Day, Independence Day, Labor Day, <br />Veterans Day, Thanksgiving Day, Friday ager Thanksgiving, Christmas Eve and Christmas <br />Day. Working on these days will not be permitted without prior written permission and <br />approval from the County Engineer. <br />If the Contractor fails to complete the requirements of General Condition G, AWARD OR <br />REJECTION OF BIDS, then additional time in calendar days required to correc0y complete <br />the documents will be deducted tiom the Contract Time in working days specified above. <br />GC -3 <br />