Laserfiche WebLink
r <br />h <br />r� <br />e <br />L <br />L <br />5. GENERAL CONSTRI If TION RFO1❑RFMFNTP <br />A. Materials Handling- The Contractor shall make arrangements at this own expense for the <br />unloading and storing of materials at an approved location until needed for installation. <br />Under no circumstances will pipe, materials, or structures placed on the job site obstruct <br />driveways or streets or be placed within three feet of the pavement of streets or highways. <br />The Contractor shall provide and maintain approved barricades, warning lights, and guards <br />necessary for the protection of the public. The Contractor shall coordinate said barricades, <br />lights, and guards with the County. <br />E. Confinement nfrtaernfnna Allmnstruction operations by the Contractor shall be confined <br />to public rights-of-way, casements, or building sites secured by the County for this work. <br />No equipments moving, parking, material storage, etc., shall be permitted on private property <br />without the property owner's consent in writing. <br />The Contractor shall be responsible for trespassing upon private property and for damage to <br />any property, public or private. <br />Easements and rights-of-way are shown in approximate location on the Drawings and have <br />been obtained by the County. The Contractor shall be fully responsible for constructing the <br />work within the legal rights-of-way and easements. <br />b, PFRMITS AND IICFNSFS <br />Right -of -Way Permits required for construction within the public right-of-way will be issued by the <br />Public Works Department, Indian River County, at no cost to the Contractor. Any permits for <br />disposal ofmaterials shall be the Contractors responsibility. See Section 7 ofthe Special Provisions. <br />7. DISPOSITIONOFDFHRIS <br />All debris shall be removed and disposed of by the Contractor and approved by the Engineer. Ilia <br />the Contractor's responsibility to obtain all necessary permits. <br />g, 1.AYOt IT OF WORK AND AS -B1 JILT DRAWINGS- The contractor will provide survey work to <br />establish right-of-way, base lines, centerlines, and grades as may be required for the work prior to <br />any construction. The Contractor shall protect these controls. The Contactor shall keep records on <br />project modifications with sufficient detail so that as -built drawings may be prepared to the <br />Engineers satisfaction at the Contractor's mst. Contactor shall be responsible for establishing all <br />finished guides with the benchmark datum provided on the plans. <br />SP -2 <br />