Laserfiche WebLink
9. DISPOSITION OF SATMAOFART F MATPRIAI S <br />All side drains removed from residential driveway entrances within the right-oPway shall became <br />the property of the respective homeowner. Those homeowners not desiring the side drains may <br />donate them to the County free of charge. ICContractor is unable to contact respective owner, he <br />f will notify the Engineer. All salvageable cross drains under existing roads, not to be used in the <br />Contract are the property of Indian River County. Contractor will stockpile all salvageable cross <br />drains and side drains in a safe place within County right-of-way, to be picked up by County Crews. <br />Contractor will notify Engineer of stock -piled materials to be removed. All other culverts, side <br />drains, and cross drains will be disposed ofby, or become the property of, the Contractor. <br />10. <br />I <br />It is the Contractors responsibility to locate all utilities and to protect from damage all utilities that <br />might be in the work area. Wherever the underground installation ofutility lines or other structures <br />proceeds through surface improvements, the Contractor shall he responsible for the protection and <br />preservation ofthe improvements. This shall include removal, storage and subsequent replacement <br />of such improvements to the original, undisturbed condition. <br />Property abstractions which are to remain in place, such as sewers, fences, drains, water, irrigation <br />systems or gas pipes, conduits, wires, or cables above or below ground are to be carefully protected <br />from injury and are not to be displaced. No land monuments, property markers, or official datum <br />points shall be damaged or removed by the Contractor. The Contractor will be held responsible to <br />repair or replace any damage he causes to the above at his expense. <br />11. SHRI IRC AND COD <br />Shrubs and sod within the limits ofco mudion not shown or directed to be removed shall be taken <br />up with sufficient root ball and soil, suitably stored, watered and replaced as soon as backfilling <br />permits. Shrubbery and sod mishandled or damaged during construction operations that does not <br />survive shall be replaced with similar vegetation and maintained by the Contractor until survival is <br />assured. <br />12. ¢ITR r4FAN1 IP <br />During the progress ofthe project, the work and 0re adjacent areas affected thereby shall be kept in <br />a neat and orderly condition. All rubbish, surplus materials, and unused construction equipment <br />shall be removed. All damage shall be repaired so that the public and property owners will be in. <br />convenienced as little as possible. <br />r Where material or debris has been deposited in watercourses, ditches, gutters, drains, or catch -basins <br />as a result of the Contractor's operations, such material or debris shall be removed. <br />i Before the completion ofthe project, the Contractor shall, unless otherwise especially directed or <br />permitted in writing, tear down and remove all temporary buildings and structures which he builds; <br />remove all temporary works, tools, and machinery or other construction equipment famished by <br />I Lhim; remove, acceptably disinfect, and cover all organic matter and material containing organic <br />� <br />SP -3 <br />V <br />