Laserfiche WebLink
P <br />' matter in, under, and around privies, houses, and other buildings used by him; remove all rubbish <br />from any grounds which he has occupied; and leave the mads, all parts ofthe premises and adjacent <br />1 property affected by his operations, in a neat and satisfactory condition. <br />The Contractor shall restore or replace, when and as directed, any public or private property <br />1 damaged by his work, equipment, or employees, to a condition at least equal to that existing im- <br />mediately prior to the beginning ofthe operations. To this end, the Contractor shall do all required <br />highway and landscaping work. Acceptable materials, equipment, and methods shall be used for <br />such restoration. <br />The Contractor shall thoroughly clean all materials and equipment installed by him and his <br />subcontractors and on completion of the work shall deliver the facility undamaged and in fresh and <br />new -appearing condition. <br />R is the intent of the Specifications to place the responsibility on the Contractor to restore to original <br />condition items such as but not limited to trees, fencing, shrubbery, signs, lightpomi, etc., destroyed <br />or damaged during construction. <br />13. MAINTFNANCF AND PROTFf TION OF TRAFFIC POT)- The Contractor shall properly <br />maintain orderly and safe traffic operations al all times during the term of the contract according to <br />thereethods and procedures established by the Florida DOT Roadway and TIBRC Design Standards, <br />and the Manual on Uniform Traffic Control Devices (Federal Highway Administration). Every <br />effort shall be made to provide maximum vehicular and pedestrian safety at all times. The Engineer <br />shall approve all traffic maintenance and protection plans and operations. <br />15. Following is a description of the various items included in this contract. The Contractor should <br />review these items carefully to determine what is included in each item of work and the contractors <br />responsibility in doing each item of work. It is intended that these items, taken together, will <br />constitute the entire work for this contract, no further payment will be made beyond that set out in <br />these work items except for properly authorized additional work and changes, or increased <br />quantities. The Contractor shall consider this in making his bid and structure his bid accordingly, <br />taking into consideration work that is implied in the plans coupled with existing features and condi- <br />tions on the site. <br />The work specified in this section shall conform to Section 101 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. (2000 Edition) <br />Item ofPavment <br />Payment for the work specified in this item shall be made under: <br />�. Bid Item Mobilization Lump Sum <br />L� <br />SP -4 <br />