My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-310
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 11:36:59 AM
Creation date
8/6/2024 11:35:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/10/2000
Control Number
2000-310
Agenda Item Number
11.G.3.
Entity Name
Sheltra & Sons
Subject
Contract for Paving & Drainage Improvements to Willow St. (130 Ave.)
Phase II Between 85th St. & 89th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />' matter in, under, and around privies, houses, and other buildings used by him; remove all rubbish <br />from any grounds which he has occupied; and leave the mads, all parts ofthe premises and adjacent <br />1 property affected by his operations, in a neat and satisfactory condition. <br />The Contractor shall restore or replace, when and as directed, any public or private property <br />1 damaged by his work, equipment, or employees, to a condition at least equal to that existing im- <br />mediately prior to the beginning ofthe operations. To this end, the Contractor shall do all required <br />highway and landscaping work. Acceptable materials, equipment, and methods shall be used for <br />such restoration. <br />The Contractor shall thoroughly clean all materials and equipment installed by him and his <br />subcontractors and on completion of the work shall deliver the facility undamaged and in fresh and <br />new -appearing condition. <br />R is the intent of the Specifications to place the responsibility on the Contractor to restore to original <br />condition items such as but not limited to trees, fencing, shrubbery, signs, lightpomi, etc., destroyed <br />or damaged during construction. <br />13. MAINTFNANCF AND PROTFf TION OF TRAFFIC POT)- The Contractor shall properly <br />maintain orderly and safe traffic operations al all times during the term of the contract according to <br />thereethods and procedures established by the Florida DOT Roadway and TIBRC Design Standards, <br />and the Manual on Uniform Traffic Control Devices (Federal Highway Administration). Every <br />effort shall be made to provide maximum vehicular and pedestrian safety at all times. The Engineer <br />shall approve all traffic maintenance and protection plans and operations. <br />15. Following is a description of the various items included in this contract. The Contractor should <br />review these items carefully to determine what is included in each item of work and the contractors <br />responsibility in doing each item of work. It is intended that these items, taken together, will <br />constitute the entire work for this contract, no further payment will be made beyond that set out in <br />these work items except for properly authorized additional work and changes, or increased <br />quantities. The Contractor shall consider this in making his bid and structure his bid accordingly, <br />taking into consideration work that is implied in the plans coupled with existing features and condi- <br />tions on the site. <br />The work specified in this section shall conform to Section 101 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. (2000 Edition) <br />Item ofPavment <br />Payment for the work specified in this item shall be made under: <br />�. Bid Item Mobilization Lump Sum <br />L� <br />SP -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.