Laserfiche WebLink
40 <br />J <br />Section i. History of Hazards 1 Damages in the Area to be Protected <br />A. Overview of Past Damages <br />Describe all past damages from hazardous events in the project area (include name of storm, if applicable), including <br />direct and indirect costs. Include Presidentially declared disasters as well as events that did not result in a Presidential <br />declaration. Attach any supporting documents. Direct costs should include damages to structures and infrastructure <br />in the project area as a result of the hazard. Indirect costs should include the cost to the local government to respond <br />to victims of the hazard in the project area, any interruption to local businesses, and losses of public services (3 <br />examples are provided for your reference). <br />1 Date Frequency of Event Damages ($) Indirect costs (describe) <br />J 9/13/99 Hurricane Floyd $950,000 in county damage $69,000 for evacuations and emergency preparations <br />(10 year event) <br />10/14/99 Hurricane Irene $250,000 in county damage -0- <br />(5-year event) <br />Section H. Project Description <br />A. Hazards to be Mitigated / Level of Protection <br />1. Select the type of hazards the proposed project will mitigate: <br />❑ Flood IN Wind ❑ Storm surge 0 Other (list) <br />2. Identify the type of proposed project: <br />* Elevation and retrofitting of residential or non-residential structure <br />❑ Acquisition and relocation 0 Acquisition and demolition <br />® Wind retrofit ❑ Minor drainage project that reduces localized flooding <br />❑ Other (please explain) <br />3. List the total number of persons that will be protected by the proposed project: 5,000 <br />4. Fill in the level of protection and the magnitude of event the proposed project will mitigate. <br />(e.g. 23 structures protected against the 100 -year (10/6) flood) <br />g structures protected against the -year Flood (10, 25, 50,100, or 500 year) <br />I structures protected against 145 mile per hour (mph) winds <br />5. Fagineered projects only (e.g. Drainage Improvements), include (attach to this page) ALL engineering <br />calculations and design plans used to determine the above level of protection. <br />6. Project will provide protection against the hazard(s) above for 50 years (i.e., what is the useful life of the <br />project). <br />Page 4 of 15 <br />