My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337C
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 12:14:01 PM
Creation date
8/13/2024 12:02:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337B
Agenda Item Number
11.B.
Entity Name
State of Florida Department of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofit Projects
Gifford Middle School
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />B. Project Description, Scope of Work, and Protection Provided <br />Describe, in detail, the existing problem, the proposed project, and the scope of work. Explain how the proposed <br />project will solve the problem(s) and provide the level(s) of protection described in Part A. Please attach a vendor's <br />estimate and/or a contractor's bid for the scope of work. <br />The County is currently experiencing a severe deficit of safe shelter spaces for our residents seeking shelter <br />from hurricane events. The safe shelter spaces that currently exist only provide protection for wind speeds of <br />up to 60 m.p.h. Retrofitting existing public shelters with a hardened window protection will reduce that <br />shelter deficit and provide a safe haven for our evacuees for wind events of up to 145 m.p.h. <br />Section M. Project Location (Fully describe the location of the proposed project.) <br />A. Site <br />1. Describe the physical location of this project, including street numbers (or neighborhoods) and zip codes; and if <br />available, please provide precise longitude and latitude coordinates for the site utilizing a hand-held global <br />positioning system (GPS) unit or the equivalent. <br />Gifford Middle School <br />2726 451" Street <br />Vero Beach, FL <br />27° 40'30'1/080* 24'46 <br />2. Is the project site seaward of the Coastal Construction Control Line (CCCL)? O YES ® NO <br />3. Provide the number of each structure type (listed below) in the project area that will be affected by the project. <br />That is, all structures in project area. <br />residential property businesses / commercial property <br />public buildings X schools / hospitals / houses of worship <br />other <br />B. Flood Insurance Rate Map (FIRM) showing Project Site <br />® Attach a copy of the FIRM map, a copy of the panel information from the FIRM, and, if available, the <br />Floodway Map. FIRM maps are required for this application (if published for your area). Also, all attached <br />maps must have the project site and structures clearly marked on the map. FIRMS are typically available <br />from your local floodplain administrator who may be located in a planning, zoning, or engineering office. <br />Maps can also be ordered from the Map Service Center at 1-800-358-9616. For more information about <br />FIRMS, contact your local agencies or visit the FIRM site on the FEMA Web -page at <br />http://www.fema.gov/home/MSEdiftEdERRYIhM <br />Using the FIRM, determine the flood zone(s) of the project site (Check all zones in the project area). <br />(see FIRM legend for flood zone explanations) <br />❑ VE or V 1-30 ❑ AE or A 1-30 <br />❑ AO or AH ❑ A (no base flood elevation given) <br />❑ B or X (shaded) ® C or X (unshaded) <br />❑ Floodway <br />❑ Coastal Barrier Resource Act (CBRA) Zone (Federal regulations strictly limit Federal funding for <br />projects in this Zone; please coordinate with your state agency before submitting an application for a <br />CBRA Zone project) <br />❑ If the FIRM Map for your area is not published, please attach a copy of the Flood Hazard Boundary Map <br />(FHBM) for your area, with the project site and structures clearly marked on the map <br />Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.