My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337E
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 12:14:55 PM
Creation date
8/13/2024 12:07:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337E
Agenda Item Number
11.B.
Entity Name
State of Florida Department of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofit Projects
Fellsmere Elementary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />C. City or County Map with Project Site and Photographs <br />• Attach a COPY of a city Or county scale map (large enough to show the eatirc prajcct area) will, the project <br />site and structures marked on the neap. <br />• Attach a USGS 1.24,000 topo map with project site clearly marked on the map.. <br />Ul Cor acquisition or elevation projects, include copy of Parcel Map (Tax Map, Property identification Map, <br />etc.) showing each property to be acquired. The map should include the Tax ID numbers for each parcel, if <br />possible. <br />® Attach photographs (2 copies each) for cath project site. 'lite photographs should be representative of the <br />project area, including any relevant streams, creeks, rivers, etc. and drainage areas which affect llm project site <br />or will be affected by the project. <br />Section IV. Budget/Costs <br />in osis section, provide details of all the estimated costs of the project. As this information is used for the Benefit -Cost Analysis, <br />reasonable cost estimates are essential. Since project administrative costs are calculated on a sliding scale, do not include them in the <br />budget. Also, do not include contingency costs in the budget. <br />A. Materials <br />Itena Dimension Quanir"t Cost per Unit cast <br />SEE BELOW <br />B. Labor (Include equipment costs -- please indicate all "soft" or in-kind matches) <br />description H2M Rata Cast <br />SEE BELOW <br />C. fees Paid Include any other costs associated with the project. <br />Descry` tioar d Task Ifaurs Rate Cast <br />NIA <br />Total Estimated Project (Cost $ 52,250' <br />*The estimated cost of this project includes all labor and materials based on an estimate provided by a <br />professional and licensed project contractor. Estimates were not detailed with materials and labor, as is <br />customary with projects of tilts type. <br />Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.