Laserfiche WebLink
f <br />40 <br />i <br />D. I ttuding Sources (round figures to the nearest dollar) <br />The maximum FEWA share for 11AlGPJFAlA projects is 75%. The other 25% can be made up of Slate and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5% of the total project costs. <br />HMGPfFMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level -- such as CDBG, ARS, I TOME) may not be used for the State or local match. <br />Estimated FEMA Share <br />Non -Federal Share <br />Estimated Local Share <br />Estimated State Share <br />$39,187.50 75% of Total (maximum of 75°A) <br />$ -0- <br />$ -0- <br />$i300.5a <br />"/� of Total (Cash) <br />of Total (In-kind) <br />25% of Total (Cash) <br />% of-fotal(in-kind) <br />Other Agency Share $ D- % of Total <br />(Identify Other Non -Federal Agency ANA 1 <br />Total l4'undingsourcesfrom above $52.256.00_ 100 _Total % (should equal 100%) <br />Other Non -FEMA Federal Fands $ N/A (Da not include in total) <br />(Identify Other Federal Agency NIA ] <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Milestone Number of Days to Complete <br />le -g., Dcrnalition of 6 structures and removal of debrisl4 days) <br />1'rovide adequate window protection for public wind shelter. 7 -[Pays following award of contract <br />Page 7 of IS <br />