Laserfiche WebLink
• <br />• <br />section I. History of Hazards I Damages in the Area to be Protected <br />A. Overview of Past Damages <br />Describe a9past damages from hazardous events in the projectarea (include name of storm, if applicable), including <br />direct and indirect costs. Include Presidentially declared disasters as well as events that did not result In a Presidential <br />declaration. Attach any supporting documents. Direct costs should Include damages to structures and Infrastructure <br />In the project area as a result of the hazard. Indirect costs should include the cost to the local government to respond <br />to victims of the hazard in the project area, any interruption to local businesses, and losses of public services (3 <br />examples are provided for your reference). <br />Date Frequency of Event Damages M Indirect costs (describe) <br />9/13199 Hurricane Floyd $950,000 in county damage $69,000 for evacuations and emergency preparations <br />(10 year event) <br />tortar" Hurricane Irene $250,000 in county damage -0- <br />(5-year event) <br />Section 17. Project Description <br />A. Hazards to be Mitigated 1 Level of Protection <br />1. Select the type of hazards the proposed project will mitigate: <br />U Flood ® Wind D Storm surge ❑ Other (list) <br />2. Identify the type of proposed project: <br />0 Elevation and retrofitting of residential or non-residential structure <br />13 Acquisition and relocation C Acquisition and demolition <br />Ell Wind retrofit 0 Minor drainage project that reduces localized flooding <br />0 Other (please explain) <br />3. List the total number of persons that will he protected by the proposed project: 5,000 <br />k Fill in the level of protection and the magnitude of event the proposed project will mitigate. <br />(e.g. 23 structures protected against the 100 -year ([%) flood) <br />__structures protected against the -year Flood (10, 25.50. too, or 50o year) <br />I structures protected against 145 mile per hour (mph) winds <br />5. Engineered projects only (e.g. Drainage [tnproventenis), include (attach to this page) ALL engineering <br />calculations and design plans used to determine the above level of protection. <br />6. Project will provide protection against the hazard(s) above far 50 years (i.e., what is the useful life of the <br />project). <br />Page 4 of 15 <br />