My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337F
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 10:51:01 AM
Creation date
8/15/2024 10:38:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337F
Agenda Item Number
11.B.
Entity Name
State of Florida Dept. of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofits Projects
Glendale Elementary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />40 <br />1), Funding Sources (round figures to the nearest dollar) <br />The maximum FEMA share for fIMGPI MA projeers is 75%. t lie other 25% can be made up of State and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maximum in-kind match be no more than 12.5% of the total project costs. <br />liMGpIFMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level —such as CDBG, ARS, I10MR) may not be used for the State or local match. <br />Estimated FEMA Share$ t++3 l5q 75% of Total (maximum of 75%) <br />Non -Federal Share <br />Estimated Local Share $ -q- % of Total (Cash) <br />q._ °/u of Total (la -kind) <br />Estimated State Share $21 q5q 25% of Total (trash) <br />g % of'rota I (In-kind) <br />Other Agency Share $ q % of Total <br />(Identify Other Non -Federal Agency NIA <br />Total Funding sources from above $84,200 1t14 Total % (should equal 144%) <br />Other Non.FEMA Federal Funds $ N/A (Do not include in fatal) <br />(Identify Other Federal Agency N/A <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for tile critical activities. <br />Number ofDays to Complete <br />ilestone <br />[e.g.,. Demolition of G structures and removal of debris14 days] <br />Provide adequate window protection for public wind slreiter. <br />7•days following :sward of contract <br />Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.