My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337F
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 10:51:01 AM
Creation date
8/15/2024 10:38:51 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />40 <br />C. City or County Map with Project Site and Photographs <br />• Attach a copy of a city or county scale neap (large enough to show She entire project area) with the project <br />site and structures marked on the map. <br />• Attach a USGS 1:24,OOD toga map with project site clearly marked on the map. <br />• For acquisition or elevation projects, include copy of Parcel Map (Tax Map, Property identification Map, <br />etc.) showing each property to be acquired. The map should include the Tax ID numbers for each parcel, if <br />possible. <br />• Attach photographs (2 copies each) far each project site. The photographs should be representative of the <br />project area, including any relevant streams, creeks, rivers, etc. and drainage areas which affect the project site <br />or will be affected by the project. <br />Section IV. Budget/Costs <br />in this section, provide details of all the estimated costs of the project. As this information is used for the Benefit -Cost Analysis, <br />reasonable cost estimates are essential. Since project administrative costs are calculated on a sliding scale, do not include them in the <br />budget. Also, do not include contingency costs in the budget. <br />A. Materials <br />am Dimension uaz it Cost per Unit Cost <br />SEE BELOW <br />B. labor (Include equipment costs -- please indicate all "soft" or in -hind matches) <br />Description Hours Rate Cost <br />SEE BELOW <br />C. fees Paid Include any other costs associated with the project. <br />Desert tion of Task Hours Bate Cost <br />N/A <br />Total 'Estimated Project Cost $84,206* <br />*The estimated cost of this project includes all labor and materials based on an estimate provided by a <br />professional and licensed pr9ject contractor. Estimates were not detailed with materials and labor, as is <br />customary with projects ot'this type. <br />Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.