Laserfiche WebLink
D. Funding Sources (round figures to the nearest dollar) <br />The mavim:ea, FEMA share far I1hfGi'JFAfA projects i$ 75Y. The other 25% can be made up of State and Local funds as well as in- <br />kind services. Moreover, the FMA program requires that the maxintutn in-kind match be no more than 12.5% of the total project costs, <br />HMGPJFMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds which lose their <br />Federal identity at the State level -- such as CDBG, ARS, I [OME) may not be used for the State or Local match. <br />I?$flmated FEMA Share <br />Nan -Federal Share <br />Estimated Local Share <br />Estimated State Share <br />$63J50 <br />$21 050 <br />75%° of Total (maximum of 75%) <br />°/° of Total (Cash) <br />% of Total (in-kind) <br />25% of Total (Cash) <br />% of'rotal(In-kind) <br />Other Agency Share $ 0- %i, of Total <br />(ldcntify Other Non -Federal Agency N!A <br />Total FliadinS sources from above $84 200 106 'Total %a (should equal 100%) <br />Other Non -FEMA Federal Funds $ N!A (Do not include in total) <br />(Identify Other Federal Agency <br />E. Project Milestones <br />List the major milestones in this project by providing an estimated time -line for the critical activities. <br />Number n leas to Chat tele <br />ileslpne <br />[e.g.. Demolition of G structures and removal. of debris 14 days9 <br />Provide adequate window protection for public wind shelter. <br />7 -days following award of contract <br />Page 7 of 15 <br />