My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-337H
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-337H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 10:52:00 AM
Creation date
8/15/2024 10:47:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
11/07/2000
Control Number
2000-337H
Agenda Item Number
11.B.
Entity Name
State of Florida Dept. of Community Affairs
Subject
Hazard Mitigation Grant Program Application for Shelter Retrofit Projects
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />40 <br />C. City or County Map wilt Project Site anti Photographs <br />• Attach a copy of a city or county scale map (large enough to show the entire project area) with the project <br />site and structures marked on the map, <br />l31 Attach a USES 1:24,004 topo neap with project site clearly marked on the map. <br />C] por acquisition or elevation projects, include copy of Parcel Map (Tax Map, Property Identification Map, <br />etc.) showing each properly to be acquired. The map should include the Tax ID numbers for each parcel, if <br />possible. <br />l Attach photographs (2 copies each) for cacti project site. The photographs should be representative of the <br />project area, including any relevant streams, creeks, rivers, etc. and drainage areas which affect the project site <br />or will be affected by the project. <br />Section 1V. Budget/Costs <br />In Chis section, provide details of all the estimated costs of the project. As this information is used for the Benefit -Cost Analysis, <br />reasonable cost estimates are essential. Since project administrative costs are calculated on a sliding scale, da mad include them in the <br />budget. Afso, do not include contingency costs in the budget. <br />A. Materials <br />Ifern Dimension Otaniit CrWsd ncr Urtit Cast <br />SEE BELOW <br />R, Labor (include equipment costs --please indicate all "soft" or in-kind [Hatches) <br />fJescrinrioit Hours Rate Cost <br />SEE BELOW <br />C. Fees Paid Include any other costs associated with the project. <br />aescrfplion aLT'ask LLOM Rate ChA <br />N/A <br />Total Estimated Project Cost $ 23.325* <br />*The estimated cost of this project includes ail labor and materials based on an estimate provided by a <br />professional and licensed project contractor. Estimates were not detailed with materials and labor, as is <br />customary with projects of this type. <br />Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.